11
Installazione - Installation - Installation - Installation - Instalación - Установка
RECOMMENDATIONS FOR PROPER USE
Proper use of this product will allow you to avoid damages to the bathroom environment.
* To prevent impurities or debris from getting inside the product and causing functional problems,
always flush out the system before connecting it to the supply pipes. It is recommended to install the
filter at the system’s water intake.
* To keep the diffuser clean and prevent lime scales from clogging the diffuser, we advise that you
periodically rub the silicone nozzles to free them of the lime deposits.
HYDRAULIC SYSTEM
Water connection:
prepare your shower environment with the water connection for showerhead
supply.
The connection must be positioned above the false ceiling (Fig. 1).
Minimum 20L/min and maximum 30L/ min of water are suffi
cient (with a maximum pressure of 5 bar)
for the shower heads to work properly. The showerhead installed parallel to the fl oor, provides a “free
falling” jet of water, like a soft rain.
Warning!
1.
Ensure that the boiler supplies suffi
cient hot water for the proper functioning.
2.
If the recommended water fl ows are exceeded, the fl ow control (8) must be installed, which is
included in the package.
Product
Water Flow Rate
HeadShower Weight (Kg)
Headshower weight with water (Kg)
Dream Rectangular
1000x500mm
min 20 L/min
max 30 L/min
18
22
Dream Cube
1000x1000mm
min 20 L/min
max 30 L/min
40
46
Dream OKI
Ø1000mm
min 20 L/min
max 30 L/min
34
39
INSTALLATION
1.
Plasterboard: Using reinforces plasterboards which comply with EEC standards (REI 120), suitable
for environments with high humidity.
2.
Once the hydraulic system has been done, build the false ceiling (plasterboard) with the proper
support, like when mounting ceiling lamps, and ensure it is perfectly levelled.
3.
Keep a distance between the ceiling and the false ceiling of at least 15 cm (Fig. 2). Position the
template (9), included in the package, and with a pencil, mark the fi xing holes and the central
recess which is needed to fi x the showerhead. (see fi gure - mounting templates).
4.
Drill the fi xing holes of 10mm in diameter in the plasterboard providing, for greater safety, at least
4 wall plugs (7) are anchored to the metal support frame (Fig. 6).
5.
Carve out recess (Fig.3).
6.
Insert the wall plugs (7) ensuring that they are properly positioned (Fig.6).
7.
If the recommended water fl ows are exceeded, insert the fl ow regulator (8) by screwing it to the
hose (5) (Fig.4).
8.
Connect one end of the hose (with or without regulator) to the 1/2”M connection with its sealing
gasket, making sure it is tightened completely. Connect the other end to the water inlet on the
wall. In the event that a 1/2”F wall connection is used, use the 1/2”M M fi tting adapter (14) inclu-
ded in the package.
9.
Place the shower head in correspondence with the previously inserted wall plugs in the false
ceiling (Fig. 5), tighten the screws (6) supplied, in order to obtain the correct fi xing of the shower
head to the false ceiling (Fig. 6). Ensure that the screws are tight and are fully screwed, performing
about 16 turns of the screw from the moment the twist starts forcing.