INSTALLATION
6 720 804 107 (2012/10)
10
TWO-PORT VALVE (S-PLAN) SYSTEM:
Fig. 21 Two-port valve system
Earth conductor
L
Phase (230 V AC)
N
Neutral conductor
Switches:
I
Code switch I – system type
II
Temperature switch II – domestic hot water cylinder
temperature
Terminal identification:
230 V AC Mains voltage
BUS
BUS
EMS plus
IZ1
DHW 2-port valve end switch
IZ2
Central heating 2-port valve end switch
IZ3
Room thermostat (
I
nput
Z
one;
: Temperature/temperature
sensor)
IZ4
Frost thermostat (
: Temperature/temperature sensor)
MD1
No function
OS1
No function
PZ1
DHW 2-port valve motor
PZ2
Central heating 2-port valve motor
PZ3
Circulating pump (
P
ump
Z
one)
T0
No function
T1
No function
TC1
Cylinder temperature sensor (
T
emperature sensor
C
ylinder)
System component:
230 V AC Mains voltage
BUS
BUS
EMS plus (connection between the Greenstar Wiring
Centre and boiler)
CZ1
2-port valve end switch, switch at valve for DHW (
C
ontact
Z
one)
CZ2
2-port valve end switch, switch at valve for central heating
(
C
ontact
Z
one)
GWC
Greenstar Wiring Centre
HS
Boiler (
H
eat
S
ource)
PHS
Circulating pump (
P
ump
H
eat
S
ource)
TC1
Cylinder temperature sensor (
T
emperature sensor
C
ylinder)
TR3
Room thermostat (
T
hermostat
R
oom temperature); optional;
TF4
Frost thermostat (
T
hermostat
F
rost protection); optional; not
VZ1
2-port valve for DHW (
V
alve
Z
one)
VZ2
2-port valve for central heating (
V
alve
Z
one)
HS
GWC
PHS
TC1
VZ1
CZ1
VZ2
CZ2
6 720 804 107-19.1O
1
2
1
2
1
2
TC1
T0
BUS
BUS
1
2
BUS
1
2
3
1
OS1
2
1
2
MD1
1
2
T1
≤ 24 V
N L
N
L
N
IN L IN L IN L IN
L
120/230VAC 120/230VAC
IZ1
IZ2
IZ3
IZ4
120/230 V AC
N
N 43
N 14
14
PZ2
PZ3
PZ1
120/230 V AC
230 V AC 230 V AC
L
N
L
N
BUS
TC1
M
VZ1
N L
L
N
N
M
VZ2
N L
L
M
PHS
N L
L
N
CZ1 CZ2
TR3
L
S
TF4
L
S
I
II
II
0
1
2
3
4
S
Y
off
off
40
40
50
50
60
60
70
70
max
max