SERVICE AND SPARES
6 720 821 670 (2018/06)
56
1. Refer to figure 85 and re move the three screws securing the turret to
the top of the appliance.
2. Turn the upper exhaust connector anti-clockwise to release from the
hook.
3. Pull the upper exhaust connector down.
Fig. 85 Upper exhaust assembly
1. Refer to figure 86 and release the clip.
2. Move the lower exhaust connector up
▶ Remove the complete exhaust assembly.
Fig. 86 Release lower exhaust connection
1. Refer to figure 87 and unscrew the plastic nut.
2. Remove the nut from the bottom of the appliance.
3. Rotate lever to release the return pipe.
Fig. 87 Sump connections
1. Refer to figure 88 and lift the heat exchanger up to clear.
2. Pull the heat exchanger forward from the case.
Fig. 88 Heat exchanger removal
▶ Reassemble and check combustion as stated in the air/gas ratio
section. 7.6.
7.8.13 SYPHON REMOVAL
To release the syphon from the sump:
1. Undo the plastic nut on the bottom of the syphon and move the
condensate pipe away from the syphon.
2. Remove the two screws retaining the syphon bracket.
3. Remove the bracket.
4. Remove the screw and release the syphon retaining clamp
5. Swing the clamp completely to the left away from the syphon
6. Pull the syphon towards you and remove from the sump connection.
Fig. 89 Syphon removal
6720643895-1
14.1W
o
1.
3.
2.
6720644744-47.1W
o
2.
1.
6720644744-52.1W
o
1.
3.
2.
NOTICE:
CO/CO
2
CHECKS
▶ If the joint between the Air/Gas manifold and heat
exchanger is disturbed sealing gasket must be
replaced.
▶ After completing the service of the appliance, the
CO/CO
2
must be checked and set to the limits shown
in “Setting the air/gas ratio” in section 7.6.
6720643895-1
15.1W
o
1.
2.
6720644744-42.1Wo
1.
2.
3.
4.
5.
6.
Summary of Contents for Worcester GREENSTAR 12Ri ErP +
Page 63: ...6 720 821 670 2018 06 63 Notes ...
Page 64: ...6 720 821 670 2018 06 64 Notes ...