Transport
6720814332 (2018/04)
21
If the lowest part of the terminal is less than 2 metres above the level of
the ground, balcony, flat roof or place to which any person has access,
the terminal must be protected by a guard.
Ensure that the guard is fitted centrally.
The flue assembly shall be so placed or shielded as to prevent ignition or
damage to any part of the building.
The flue outlet duct and the terminal of the boiler must not be closer than
25 mm to combustible material. Detailed recommendations on the
protection of combustible material are given in IGE/UP/10.
4
Transport
▶ If required, use a lifting and mounting aid.
▶ Transport the boiler to the installation location.
Fig. 33 Lifting and carrying the boiler correctly
5
Fitting
5.1
Unpacking the boiler
▶ Remove packaging and dispose of it.
▶ Prevent damage to the connections.
▶ Cover the connection for the flue gas/air supply on the top of the wall
mounted gas condensing boiler to prevent ingress.
5.2
Check gas type
▶ Make sure that the gas type to which the boiler is connected
corresponds to the gas type specified on the data plate (
figure 4,
[8]).
5.3
Mounting the boiler
The boiler may only be hung on the wall or installed on a cascade frame.
Wall-mounted installation
▶ Check whether the wall is strong enough to support the weight of the
boiler, pump group and water content.
▶ Mount a fastening structure if required.
▶ Determine the position of the boiler on the wall.
▶ Mark holes using the mounting bracket supplied (
figure 34).
▶ Install the mounting bracket on the wall with the assistance of a spirit
level.
Fig. 34 Installing the mounting bracket on the wall
▶ Hook the boiler on to the mounting bracket
▶ Level the boiler using the set screw [1] and a spirit level.
Fig. 35 Aligning the boiler
CAUTION:
Physical injury and damage to appliance due
to incorrect lifting.
▶ At least two people are required to lift and position
the boiler.
▶ Only hold the boiler at the sides and not at the control
panel or flue connection (
figure 33).
WARNING:
Gas explosion.
▶ Turn off gas valve before working on gas-carrying
components.
▶ Check for leaks before working on gas-carrying
components.
To ensure the connections are not damaged, only
remove the styrofoam at the bottom once the boiler has
been hung.
6 720 807 034-004.1DDC
NOTICE:
Damage to appliance due to incorrect lifting.
▶ Lift the boiler with one hand underneath and the
other on top of it.
6 720 807 034-027.1TD
1.
2.
3.
4.
6 720 806 792-03.1TD
1
Summary of Contents for Worcester GB162-100 V2
Page 49: ...6720814332 2018 04 49 Notes ...