![background image](http://html.mh-extra.com/html/bosch/rexroth-hq-5-h/rexroth-hq-5-h_assembly-instructions-manual_46186043.webp)
Maintenance and repair
43/60
3 842 558 544/2017-07, MIT: HQ 5/H, HQ 5/XH,
Bosch Rexroth AG
10.4.1
Replacing the toothed belt
Fig. 21:
557 617-22
5
2
3
4
SW4
SW4
1
7
SW10
X
SW4
Replacing the toothed belt on the HQ 5
1.
Slacken the toothed belt.
2.
Remove the roller track.
3.
Remove the guide
rollers.
4.
Remove the drive
bearing.
5.
Remove the toothed
belt.
6.
Install the new toothed
belt in reverse order.
7.
Pre-setting the belt
tensioner:
– Turn the adjusting
screw until the setting
dimension X (guide
value) is reached.
b = b
WT
[mm]
x [mm]
455
16.5
650
15.5
845
14
8.
The correct belt tension
then need to be set with
the frequency meter
(See page 44).
Practical tip:
Increase the belt tension
gradually (1 rotation at a
time) by turning the tension
bolt.
• Check using a workpiece
pallet if the belt is moving.
• Check if the rollers can
still be turned by hand, yet
still exhibit a noticeable
resistance.
EN
GLISH