Safety instructions 17/64
RE 50129-B/02.19, Accumulator shut-off block type ABZSS, 0532VAW,
Bosch Rexroth AG
2.7 Personal protective equipment
During operation and maintenance work as well as during installation and removal
of the accumulator shut-off block, always wear the following personal protective
equipment:
• Protective gloves
• Ear protection
• Safety shoes
• Safety goggles
• Protective helmet
2.8 Obligations of the machine/system manufacturer
In order to ensure safety when handling the accumulator shut-off block, the machine/
system manufacturer must:
• Select the safest installation position for the accumulator shut-off block possible
in order to avoid possible damage of the accumulator shut-off block and its
attachment parts.
• Provide for sufficient protection of the accumulator shut-off block including all
attachment parts depending on the selected installation position in order to avoid
the possible damage of the accumulator shut-off block and its attachment parts.
• Prescribe the wearing of personal protective equipment or perform suitable
protective measures in order to reduce the risk of collision, the risk of hearing
damage and the risk of burning at hot surfaces for operating and maintenance
personnel.
• Label the hydraulic components according to the specifications of EN ISO 4413,
section 7.4 et sqq.
• Take suitable protective measures in order to reduce the slip hazard caused by oily
surfaces around the accumulator shut-off block.
2.9 Obligations of the machine end-user
In order to ensure safety when handling the accumulator shut-off block and its
components, the machine end-user of the system must:
• Guarantee the intended use of the accumulator shut-off block and its components
according to chapter 2.2 "Intended use".
• Instruct the operating personnel regularly in all items of the operating instructions
and make sure that they are observed.
• Ensure compliance with the instructions on occupational safety and with the
operating instructions of the machine manufacturer and the machine end-user.
Corresponding proof of implementation should be documented.