
MKE
3-2
Electrical connections
DOK-MOTOR*-MKE*******-PRJ1-EN-E1,44
•
06.97
3.2
Connections for motors with terminal boxes
Terminal diagram
Note:
Only direct connections between motor and drive controller are
depicted. The terminal diagrams, however, also apply to all
other types, e.g., with intermediate connector, as the allocation
of the connections of motor and drive controller never change.
Fig. 3-2: Terminal diagram of MKE motor with terminal box
Summary of Contents for R911274804
Page 6: ...MKE IV Contents DOK MOTOR MKE PRJ1 EN E1 44 06 97 ...
Page 22: ...MKE 2 12 Mechanical integration into the machine DOK MOTOR MKE PRJ1 EN E1 44 06 97 ...
Page 30: ...MKE 3 8 Electrical connections DOK MOTOR MKE PRJ1 EN E1 44 06 97 ...
Page 36: ...MKE 4 6 MKE 035 DOK MOTOR MKE PRJ1 EN E1 44 06 97 ...
Page 42: ...MKE 5 6 MKE 045 DOK MOTOR MKE PRJ1 EN E1 44 06 97 ...
Page 48: ...MKE 6 6 MKE 096 DOK MOTOR MKE PRJ1 EN E1 44 06 97 ...
Page 50: ...MKE 7 2 Condition at delivery DOK MOTOR MKE PRJ1 EN E1 44 06 97 ...
Page 69: ...MKE DOK MOTOR MKE PRJ1 EN E1 44 06 97 Service Notes 12 3 Fig 12 2 MKE on DKC ...
Page 70: ...MKE 12 4 Service Notes DOK MOTOR MKE PRJ1 EN E1 44 06 97 Fig 12 3 MKE on HDS HDD ...
Page 75: ......