F 002 DG9 A14
2016-07-07
|
Bosch Limited
Commissioning | NTI 105 | 9
en
1
2
A14_18
Fig. 5:
Fitting the knob
1 Slot
2 Knob
2.
Hand tighten the knob (Fig. 5, Pos. 2) to the slot
(Fig. 5, Pos. 1).
1
A14_19
Fig. 6:
Assembling the cable winder
1 Cable winder
3.
Assemble the cable winder (Fig. 6, Pos. 1) to the
nitrogen tank.
4.
Switch off the compressor.
5.
Connect the hose from the compressor output to the
input of the FRC (Fig. 7, Pos. 4).
6.
Connect the power cable to the power inlet
(Fig. 3, Pos. 5).
7.
Connect the other end of the power cable to
230 VAC, single-phase mains supply.
8.
Switch on the compressor.
1
2
3
4
A14_13
Fig. 7:
FRC unit
1 Knob
2 Pressure gauge
3 Drain
4 Input from compressor to FRC
9.
Observe the pressure gauge (Fig. 7, Pos. 2) of the
FRC.
The pressure should be at least 8 bar.
10.
Switch on the mains supply.
11.
Switch on the master switch of the NTI 105.
12.
Observe the tank pressure gauge. Wait until the
tank pressure reaches at least 4 bar.
13.
Press
3
in the main menu.
14.
Press
1
.
Calibration self test is initiated. The message
AT-
MOSPHERIC CALIBRATION
is displayed.
Once the calibration to atmospheric pressure is
complete, the message
CALIBRATED TO ATMO-
SPHERE
is displayed for a short duration and the
main menu is displayed.
"
The NTI 105 is installed and ready for operation.