15
Installation
0
8.
Insert the extractor hood over the
installation aids on the support frame.
5.
Screw together the upper and lower
sections of the support frame at the
specified overall height with 8 screws.
10.
Align the extractor hood. To do this,
loosen the ceiling screws in the support
frame.
0
9.
Screw the extractor hood to the support
frame and screw back the panel.
6.
Screw the support frame to the ceiling
with 4 screws.
7.
Remove the panel.
Summary of Contents for DIE 165 R
Page 2: ...2 en page 03 16 fr pages 17 30 es página 31 44 Abb 1 ELECTRO Fig 1 GAZ ...
Page 45: ...45 Notes ...
Page 46: ...46 Notes ...
Page 47: ...47 Noticias ...