12
en | Diagrams
2016.07 | 04 | F.01U.291.483
UL Installation Guide
Bosch Security Systens, Inc.
3.2
Power Supply Side Wiring Diagrams
3.2.1
D9412GV4/D7412GV4 v2.00 (and higher) Power Supply Side System
(D113, D122/D122L, D192G, D928, D1640, D8132) Wiring Diagram (Power
and Phone)
Figure 3.5: Side System Wiring Diagram
Callout - Description
Callout - Description
1 - If required by local AHJ, connect D113
Battery Lead Supervision Module.
8 - To Output A or Output B
2 - Batteries
9 - Listed Audible Signaling Devices rated at 12.0 VDC nominal
(do not use vibrating type horns)
3 - D122/D122L Dual Battery Harness, as
required
10 - C900V2 (optional)
4 - To Supervision Point
11 - Secondary phone line (part of D928)
5 - D1640 Transformer (NFPA applications may
require the use of a D8004 Transformer
Enclosure
12 - 560 Ω, 2 W end-of-line (EOL) Resistor (P/N: 15-03130-005)
6 - D8132 Dual Battery Charger with two
batteries (Batteries are not supervised.)
13 - D928
7 - D192G Bell Supervision Module
14 - To earth ground
Summary of Contents for D7412GV4
Page 1: ...D9412GV4 D7412GV4 v2 03 en UL Installation Guide ...
Page 2: ......
Page 38: ......
Page 39: ......