Bosch Solar Module c-Si M 60 EU I Bosch Solar Module c-Si M 60 S EU I Bosch Solar Module c-Si P 60 EU I Bosch Solar Module c-Si M 48 EU I Bosch Solar Module c-Si M 48 S EU 
Module manufacturer code 14, 17, 23

  

      

Bosch Solar Energy AG

Table of contents

2 | Table of contents | Introduction

Introduction 2

Safety guidelines 3

Positioning guidelines 4 

Installation guidelines 

 5

Circuitry guidelines 9

Electrical Connection 9

Grounding 10 

Maintenance and care 

10

Disposal 11

10 

Storage and transport 11

Please read this installation and operation guide com-
pletely and carefully before you transport, install and 
operate the solar modules! It contains (among other 
information) important safety information which you must 
know. When solar modules are used without observing all 
instructions in this guide, all warranty and guarantee 
claims towards us shall lapse. We reserve the right to 
update the information in this guide without prior notice.

The installation, setup and commissioning of solar mod-
ules requires a high level of expertise and experience, and 
therefore must be performed solely by specialists (e. g. a 
specialist electrician) who can verify the successful com-
pletion of suitable training. 

1 Introduction

These installation and operating instructions only apply to 
the following products with Module Manufacturer Codes 
14, 17 and 23
 in the product ranges: 

 

Bosch Solar Modules c-Si P 60 EU 

 

Bosch Solar Modules c-Si M 60 EU 

 

Bosch Solar Modules c-Si M 60 S EU 

 

Bosch Solar Modules c-Si M 48 EU 

 

Bosch Solar Modules c-Si M 48 S EU

The installation and operating instructions dated 01/2013 
apply to the Bosch solar modules in the aforementioned 
product range with the Module Manufacturer Codes 14, 
17 and 23 only. These installation and operating instruc-
tions are not to be used for Module Manufacturer Codes 
11 and 13.

Summary of Contents for c-Si M 60 S EU

Page 1: ... I Bosch Solar Module c Si M60 S I Bosch Solar Module c Si P60 Robert Bosch GmbH Australia Operating instructions for products with module manufacturer code 14 17 23 Issue 08 2013 Installation and Operation Guide Crystalline Solar Modules Bosch Solar Module c Si M 60 EU ...

Page 2: ...l warranty and guarantee claims towards us shall lapse We reserve the right to update the information in this guide without prior notice The installation setup and commissioning of solar mod ules requires a high level of expertise and experience and therefore must be performed solely by specialists e g a specialist electrician who can verify the successful com pletion of suitable training 1 Introd...

Page 3: ...er than 120V Even when the light intensity is low one must reckon with the full atrest voltage of the modules that is to Important notice say in the course of setup one must always exercise the greatest caution with regard to electrical faults e g short circuits The separation of conductors which carry direct cur rent can lead to light arcs Therefore prior to perform ing any work on the solar syst...

Page 4: ...cleaning the angle of inclination must amount to at least 10 For optimized selfcleaning a 15 minimum angle of inclination is recommended Always ensure that the reverse side of the module is well ventilated Attention Due to heat accumulation under the modules there is an increased fire hazard associated with rooftop installations which do not meet the aforementioned requirements You should mount th...

Page 5: ...rrosion between the solar module and substructure is prevented when different materials are used Fasten the solar modules in such a way that they are able to withstand all anticipated loads and any impacts caused by weather conditions Use only corrosion resistant screws to install modules Ensure the support structure does not allow rainwater or condensation water to reach the cable screw con necti...

Page 6: ...r Energy AG 6 Installation guidelines pressure load rating 2400 Pa pressure load rating 5400 Pa without central support with central support screw fasten ing to assem bly holes fastener clamp system on long sides fastener clamp system on short sides slide in or lay in system slide in or lay in system table 2 vertical fastening area 500 500 360 440 360 440 400 200 400 300 300 central support clamp ...

Page 7: ...olar Energy AG Installation guidelines 7 table 3 horizontal fastening area central support clamp section junction box pressure load rating 2400 Pa pressure load rating 5400 Pa without central support with central support screw fasten ing to assem bly holes fastener clamp system on long sides fastener clamp system on short sides slide in or lay in system slide in or lay in system 500 500 300 300 40...

Page 8: ...3mm and have a surface area of at least 2mm width When fastening modules in the area of the module or drainage corners the following should be observed If corner clamps are used a minimum cover area of 28mm of the clamp must be ensured length of the assembly clamp The assembly clamp must overlie by min 8mm and max 12mm on the frame depth of assembly clamp figure 2 reverse side c Si M 60 and M 60 S...

Page 9: ...uali fied specialists In the process they must comply with the relevant industrial standards and regulations for PV systems such as the German Association for Electrical Electronic Information Technologies regulations DIN standards German Association of Energy and Water Industries guidelines the network operator s technical connection conditions and employers liability insurance associations accid...

Page 10: ...ures 7 Grounding Important notice Earthing Grounding Requirements In accordance with AS NZS 5033 clause 4 4 2 2 PV mo dules and mounting frame earth connections are to be a purpose made fitting providing earthing or bonding connections or purpose made penetrating washers or equivalent between the PV modules and mounting frame for the connection of dissimilar metals purpose made fittings are instal...

Page 11: ...rd of organic material e g dry grass hay combustion in the vicinity of the system Avoid bending during transport or when unpacking Do not drop the modules Do not place any objects on the modules Do not handle the modules using sharp objects In the course of storage and transport it must be ensured that each solar module is sufficiently rein forced The stacking of packaging units can cause damage t...

Page 12: ...de Bosch Solar Energy AG Robert Bosch Straße 1 99310 Arnstadt Germany Tel 49 0 3628 66 44 0 Fax 49 0 3628 66 44 1133 www bosch solarenergy com ...