Safety guidelines | 3

2 Safety guidelines

The setup and commissioning of the electrical system 
may only be performed by a specialist electrician in 
observance of the following guidelines, since improper 
performance of this work can lead to damage and injury. 
When performing work on solar generators – primarily 
on roofs – suitable safety precautions (e. g. fall arresting 
devices) must be used. The regulations set forth by 
Employers‘ Liability Insurance Associations must abso-
lutely be observed. For your own safety and to safeguard 
your solar module, please observe the following safety 
guidelines:

  During the setup and maintenance of solar modules, 

the valid regulations and safety guidelines for the 
installation of electrical devices and systems, as well 
as the regulations set forth by the competent energy 
supply company for the parallel grid operation of 
solar power systems.

  Prior to setup, the solar module must be inspected 

for mechanical soundness. Damaged solar modules 
(e. g. modules with broken glass, damage to the insu-
lation film at the reverse) may not be set up

  Damage to the insulation film at the reverse has se-

vere potential consequences (delamination, endan-
germent of life and health). 

  You should mount the solar module in such a way that 

it is not affected by shade (even temporary or partial 
shade caused by dormers, trees or similar obstacles). 
Shaded PV arrays can lead to PV generator failure and 
losses in performance.

  The serial connection of the modules (addition of the 

module voltages) may result in voltages above the 
safety extralow voltage of 120 V DC!

  The modules have been classified for Application 

Class A: dangerous voltage (IEC 61730: 50 V, EN 
61730: greater than 120 V)

  Even when the light intensity is low, one must reckon 

with the full atrest voltage of the modules – that is to 

Important notice!

say, in the course of setup, one must always exercise 
the greatest caution with regard to electrical faults 

  (e. g. short circuits).

  The separation of conductors which carry direct cur-

rent can lead to light arcs. Therefore, prior to perform-
ing any work on the solar system – particularly prior to 
separating the plug connectors in the direct-current 
circuit – it is essential to disconnect the frequency 
inverter from the alternating-current grid.

  For roof-mounted systems, the modules must be 

attached above a fireresistant surface.

  Solar modules may not be installed near easily- 

flammable substances, gases or vapors.

  The guidelines on fires in electrical systems  

(e. g. VDI 3819) apply hereto.

  The maximum permissible totalsystem voltage for 

the frequency inverter may never be exceeded. In 
addition, due to the negative temperature coefficient 
of the solar modules, the atrest voltage of the total 
system at the minimum permissible temperature 
must also be calculated (see data sheet and module 
type sign).

  The solar module is to be treated as a glass product 

and may therefore not be used or walked on under 
any circumstances in the transport container or used 
as a placement area (e. g. for toolboxes), since this 
can lead to visible or even invisible damage (e. g. 
microcracks in the cells and with that, a premature 
drop in output – among other faults).

  The module frames may not be drilled, nailed or 

welded to a contact surface.

  The solar modules may not be held or transported by 

their connector cables or by the connector socket.

  Solar modules may never be left standing freely or 

unsecured.

  The safety guidelines set forth by the manufacturers 

of other components of the solar system must be 
followed.

  The drainage drill holes in hollowchamber frames may 

not be covered.

 

Bosch Solar modules meet the building regulation list 
requirements for PV modules having a maximum glass 
surface of by 2 m² as established by the DIBt 
(Deutsches Institut für Bautechnik, [German Institute 
for Building Technology]).

Summary of Contents for c-Si M 60 S EU

Page 1: ... I Bosch Solar Module c Si M60 S I Bosch Solar Module c Si P60 Robert Bosch GmbH Australia Operating instructions for products with module manufacturer code 14 17 23 Issue 08 2013 Installation and Operation Guide Crystalline Solar Modules Bosch Solar Module c Si M 60 EU ...

Page 2: ...l warranty and guarantee claims towards us shall lapse We reserve the right to update the information in this guide without prior notice The installation setup and commissioning of solar mod ules requires a high level of expertise and experience and therefore must be performed solely by specialists e g a specialist electrician who can verify the successful com pletion of suitable training 1 Introd...

Page 3: ...er than 120V Even when the light intensity is low one must reckon with the full atrest voltage of the modules that is to Important notice say in the course of setup one must always exercise the greatest caution with regard to electrical faults e g short circuits The separation of conductors which carry direct cur rent can lead to light arcs Therefore prior to perform ing any work on the solar syst...

Page 4: ...cleaning the angle of inclination must amount to at least 10 For optimized selfcleaning a 15 minimum angle of inclination is recommended Always ensure that the reverse side of the module is well ventilated Attention Due to heat accumulation under the modules there is an increased fire hazard associated with rooftop installations which do not meet the aforementioned requirements You should mount th...

Page 5: ...rrosion between the solar module and substructure is prevented when different materials are used Fasten the solar modules in such a way that they are able to withstand all anticipated loads and any impacts caused by weather conditions Use only corrosion resistant screws to install modules Ensure the support structure does not allow rainwater or condensation water to reach the cable screw con necti...

Page 6: ...r Energy AG 6 Installation guidelines pressure load rating 2400 Pa pressure load rating 5400 Pa without central support with central support screw fasten ing to assem bly holes fastener clamp system on long sides fastener clamp system on short sides slide in or lay in system slide in or lay in system table 2 vertical fastening area 500 500 360 440 360 440 400 200 400 300 300 central support clamp ...

Page 7: ...olar Energy AG Installation guidelines 7 table 3 horizontal fastening area central support clamp section junction box pressure load rating 2400 Pa pressure load rating 5400 Pa without central support with central support screw fasten ing to assem bly holes fastener clamp system on long sides fastener clamp system on short sides slide in or lay in system slide in or lay in system 500 500 300 300 40...

Page 8: ...3mm and have a surface area of at least 2mm width When fastening modules in the area of the module or drainage corners the following should be observed If corner clamps are used a minimum cover area of 28mm of the clamp must be ensured length of the assembly clamp The assembly clamp must overlie by min 8mm and max 12mm on the frame depth of assembly clamp figure 2 reverse side c Si M 60 and M 60 S...

Page 9: ...uali fied specialists In the process they must comply with the relevant industrial standards and regulations for PV systems such as the German Association for Electrical Electronic Information Technologies regulations DIN standards German Association of Energy and Water Industries guidelines the network operator s technical connection conditions and employers liability insurance associations accid...

Page 10: ...ures 7 Grounding Important notice Earthing Grounding Requirements In accordance with AS NZS 5033 clause 4 4 2 2 PV mo dules and mounting frame earth connections are to be a purpose made fitting providing earthing or bonding connections or purpose made penetrating washers or equivalent between the PV modules and mounting frame for the connection of dissimilar metals purpose made fittings are instal...

Page 11: ...rd of organic material e g dry grass hay combustion in the vicinity of the system Avoid bending during transport or when unpacking Do not drop the modules Do not place any objects on the modules Do not handle the modules using sharp objects In the course of storage and transport it must be ensured that each solar module is sufficiently rein forced The stacking of packaging units can cause damage t...