
34
|
Shutting down
SB625WS/SB745WS
6 720 805 218 (2013/02)
7
Shutting down
7.1
Shutting down the heating system
Shut down your heating system via the control unit. Switching off the
control unit also switches off the burner automatically.
▶ Set the On/Off switch of the control unit to "0" (Off).
▶ Isolate the fuel supply to the burner.
7.2
Shutting down the heating system in an emergency
▶ In dangerous situations, immediately close the main fuel shut-off
valve and the power supply of the heating system via the boiler room
main breaker or the heating system emergency stop switch.
▶ Isolate the fuel supply to the burner.
▶ Never put your life at risk. Your own safety is paramount.
NOTICE:
Risk of system damage through frost.
When there is a frost, the heating system can freeze up if
it is not operational, e.g. because of a fault shutdown.
▶ When there is a risk of frost, protect your heating
system against freezing up.
▶ If your heating system has been shut down for several
days due to a fault shutdown and there is a risk of
frost, drain the heating water at the drain & fill valve.
Also leave the air vent valve at the highest point in the
system open.
NOTICE:
Risk of system damage through frost.
The heating system can freeze up as a result of a power
failure or if the power has been switched off.
▶ Check the "Control unit settings" to ensure the system
remains operational (especially when there is a risk of
frost).
NOTICE:
▶ Always keep the oil supply valve shut off if the burner
is shut down for an extended period of time.
Only in emergencies, switch OFF the heating system via
the boiler room breaker or the heating system
emergency stop switch.
Summary of Contents for Buderus SB625WS
Page 51: ... 51 6 720 805 218 2013 02 SB625WS SB745WS Notes ...
Page 52: ......