
24
|
Installation
SB625WS/SB745WS
6 720 805 218 (2013/02)
5.5
Combustion gas exhaust
The flue gas exhaust and stack connection must be made in compliance
with applicable laws and standards, using heat resistant, condensate
resistant and stress resistant rigid pipe and sealed joints.
The stack must be fitted with a condensate trap and drain and the flue
gas exhaust pipe must be installed at a slope of at least 2° towards the
boiler. All condensate should be treated through a neutralization media
before being eliminated to the floor drain.
Fig. 22 Typical installation schematic
H
ø i
6 720 805 218-26.1T
Description
Symbol
Unit
SB625WS
SB745WS
160
220
290
370
480
640
800
1050
1300
1550
Height of flue
gas outlet
H
inch
[mm]
19 7/8
(505)
19 7/8
(505)
21 1/2
(545)
21 1/2
(545)
25 3/8
(645)
25 3/8
(645)
26 3/4
(680)
26 3/4
(680)
28 3/8
(720)
31 11/18
(805)
Diameter of flue
gas fitting
Ø i
[mm]
200
200
250
250
300
300
350
350
400
450
Table 10 Combustion gas exhaust
Summary of Contents for Buderus SB625WS
Page 51: ... 51 6 720 805 218 2013 02 SB625WS SB745WS Notes ...
Page 52: ......