Assembly 27/64
3 842 358 792/2016-12, Material and information fl ow technology: HQ 2/C-H, HQ 4,
Bosch Rexroth AG
7.6.7
Installing the DA 2/150-E outfeeding damper
Fig. 13:
551 261-36
M
D
=25 Nm
SW13
b
Q
b
L
Installing the DA 2/150-E unloading damper
Please note:
For use with:
• WT 2/H, WT 2/F-H and
HQ 2/C-H
Required accessories
• DA 2/150-E damper for
HQ 2/C-H
3 842 548 644
Install the kit on
the center of the lift
transverse unit.
EN
GLISH
551261_2016_12_EN.indd 27
551261_2016_12_EN.indd 27
22.12.2016 10:26:35
22.12.2016 10:26:35