32
9. SCOPE OF SUPPLY
OPTIONAL
EQUIPMENT
UM 30
UM 50
UM 100
UM 150
UM 200
UM 300
AIR PRE-HEATER
(FOR HIGH EFFICIENCY)
Tube bank with
fl
ue
gases running inside and
air running outside the
tubes
/
/
1 pc.
1 pc.
1 pc.
1 pc.
Rectangular section
shape casing
/
/
1 pc.
1 pc.
1 pc.
1 pc.
Mineral wool insulation,
external covering made
of stainless steel
/
/
1 pc.
1 pc.
1 pc.
1 pc.
Inspection and mainte-
nance upper door
/
/
1 pc.
1 pc.
1 pc.
1 pc.
SECOND FEED WATER PUMP
Reserve water pump,
with accessories
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
HIGH TEMPERATURE FEED WATER
PUMP
Feed water pump to
reach temperature above
95 °C
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
SECOND SAFETY VALVE
Second safety valve
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
HUMIDITY SEPARATOR
Water trap, to separate
condensate from steam
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
MODULATING BURNER REGULATION
Modulating burner
regulation, special con
fi
-
guration on request
/
1 pc.
1 pc.
1 pc.
/
/
LADDER FOR BURNER
Ladder for burner main-
tenance
/
/
/
1 pc. (vertical
version)
1 pc. (vertical
version)
1 pc. (vertical
version)
FLUID FUEL FEEDING STATION
Plunger pump, complete
with shut-off valve (
fl
uid
fuel only)
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.