D
UAL
C
YCLE
-
R
EFRIGERATED
C
OOLING
C
OMPONENT
Page 22
Commissioning
Installation Instructions
Commissioning
C
OMMISSIONING
C
HECK
L
IST
Site
□
Return panels and covers to their correct position and check that they are well secured.
□
Ensure all service caps are fitted and correctly tightened.
□
Attach the electrical wires and pipes to the wall with clamps.
□
Check all the operations of the air-conditioner. Follow the operating manual for
instruction.
Indoor Coil
□
Is the condensate drain fixed securely and has it been tested?
□
Are all ducting connections secured and free from air leaks?
Outdoor Unit
□
Check for any abnormal noise or vibrations during operation of the air conditioner.
□
Check that the noise, condensate drainage or air flow does not disturb the neighbors.
□
Run the dual cycle system for cooling and check operation.
Customer Handover
□
Explain to the customer together with the operating instructions
□
How to remove, clean and replace the filter
□
How to turn the air-conditioner on and off.
□
How to choose between heating and cooling and how to set the desired temperature.
□
How to operate the air conditioner from the controller.
□
Ensure the warranty details are completed correctly. The warranty section is found in
the rear of the owner’s manual.
□
Ensure the model and serial number sticker is inserted in the warranty section of the
owner’s manual. The warranty section is found in the rear of the owner’s manual.