22
Manual version:
1.01 / Nov. 2011
Manual rev.:
2
Do
ku
me
nt
ace s
troje
Do
ku
me
nt
at
ion der
Mas
c
hi
nen
Machine docume
ntation
Sf
Attention!
If the ambient temperature drops below 15 ˚ C is required
before operating the machine to have switch on hydraulic unit
around 10 minutes and then made several motion few times (for
example, in manual mode) by all hydraulic cylinders. The
reason is to heat hydraulic oil to the operating temperature for
proper function of the pressure switches (and choke).
2.5.
Activation
2.5.1.
Machine working conditions
Keep the conditions of the manufacturer for machine operating! If recommendations
are not kept, damage can occur to the machine.
The manufacturer warrants the correct function of the machine for these
conditions:
•
At temperature air from
5°C to 40°C
, the temperature average during 24 hours
must
not exceed over 35°C
.
•
At relative dampness of the air in the extend from 30% to 95% (not concentrate).
Altitude lower than 1000 metres.
•
Do not expose the machine to the radiation (for example microwave radiation,
ultra-violet radiation, laser radiation, x-ray radiation). Radiation can cause problems
with the machine function and deteriorating condition of the isolation.
2.6.
Band saw unpacking and assembling
Remove the packing from the machine and unpack all parts.
If the hydraulic unit is outside the machine (the machine only connected hoses and
cables), it needs to be placed and mounted on a solid basis (floors, etc.). The mounting
holes are used on the bottom (bases) of the tank.
2.6.1.
Machine installing and levelling
Check the floor supporting capacity before machine installing. If the floor capacity does
not agree with requirements, you must prepare the necessary base for the machine.
Minimal requirement:
machine weight –
Workline 510.350 DG – 685 kg
+ weight of accessories
+ maximum weight of material
•
The machine must be levelled at the horizontal position. All feet of the machine
must touch with the floor after levelling
•
The machine must be levelled by means of the calibrated spirit level. Spirit level is
put on the vice area. Set the roller conveyors according to the spirit level.
•
For machine levelling, take care that there is sufficient available space for
operation, repair work, servicing of the machine and handling the material..
•
The machine including appended parts and accessories must be visible from the
place of operation.
2.6.2.
Machine disposal after lifetime
Blown out all service fluids (cooling liquid, hydraulic oil) into designated reservoir.
Dismantle machine into separate parts and dispose them in accordance with valid
directives.
Attention!
Switch off the main switch and lock it, before you start
assembly! Otherwise, there is possibility of hazardous machine
starting.
Summary of Contents for Workline 510.350 DG
Page 3: ...3...
Page 4: ...4 Manual version 1 01 Nov 2011 Manual rev 2...
Page 7: ...7 Bezpe nostn pokyny Sicherheitshinweise Safety notes 1 Safety notes...
Page 29: ...29 Ovl d n stroje Bedienung der Maschine Machine control 3 Machine control...
Page 39: ...39 dr ba stroje Wartung Machine service 4 Machine service...
Page 40: ...40 Manual version 1 01 Nov 2011 Manual rev 2 dr ba stroje Wartung Machine service...
Page 48: ...48 Manual version 1 01 Nov 2011 Manual rev 2 dr ba stroje Wartung Machine service...
Page 57: ...57 Z vady Troubleshooting 5 Z vady Troubleshooting...
Page 62: ...62 Manual version 1 01 Nov 2011 Manual rev 2 Sch mata Schemas Schematics...
Page 63: ...63 Sch mata Schemas Schematics 6 Sch mata Schemas Schematics...
Page 65: ...65 Sch mata Schemas Schematics...
Page 66: ...66 Manual version 1 01 Nov 2011 Manual rev 2 Sch mata Schemas Schematics...
Page 67: ...67 Sch mata Schemas Schematics...
Page 70: ...70 Manual version 1 01 Nov 2011 Manual rev 2 7 1 Workline 510 350 DG...
Page 71: ...71 7 2 Kusovn k St ckliste Piece list Workline 510 350 DG...
Page 72: ...72 Manual version 1 01 Nov 2011 Manual rev 2 7 3 Rameno S gerahmen Saw arm...
Page 73: ...73 7 4 Kusovn k St ckliste Piece list Rameno S gerahmen Saw arm...
Page 74: ...74 Manual version 1 01 Nov 2011 Manual rev 2 7 5 Nap n n Spannung Tensioning...
Page 75: ...75 7 6 Kusovn k St ckliste Piece list Nap n n Spannung Tensioning...
Page 76: ...76 Manual version 1 01 Nov 2011 Manual rev 2 7 7 Veden p su S gebandf hrung Belt guide...
Page 77: ...77 7 8 Kusovn k St ckliste Piece list Veden p su S gebandf hrung Belt guide...
Page 78: ...78 Manual version 1 01 Nov 2011 Manual rev 2 7 9 Vod c kostka F hrungsklotz Guiding cube 1...
Page 79: ...79 7 10 Kusovn k St ckliste Piece list Vod c kostka F hrungsklotz Guiding cube 1...
Page 80: ...80 Manual version 1 01 Nov 2011 Manual rev 2 7 11 Vod c kostka F hrungsklotz Guiding cube 2...
Page 81: ...81 7 12 Kusovn k St ckliste Piece list Vod c kostka F hrungsklotz Guiding cube 2...
Page 82: ...82 Manual version 1 01 Nov 2011 Manual rev 2 7 13 Konzola oto n Drehkonsole Turnable console...
Page 83: ...83 7 14 Kusovn k St ckliste Piece list Konzola oto n Drehkonsole Turnable console...
Page 84: ...84 Manual version 1 01 Nov 2011 Manual rev 2 7 15 Sv r k Schraubstock Vice 1...
Page 85: ...85 7 16 Kusovn k St ckliste Piece list Sv r k Schraubstock Vice 1...
Page 86: ...86 Manual version 1 01 Nov 2011 Manual rev 2 7 17 Sv r k Schraubstock Vice 2...
Page 87: ...87 7 18 Kusovn k St ckliste Piece list Sv r k Schraubstock Vice 2...
Page 88: ...88 Manual version 1 01 Nov 2011 Manual rev 2 7 19 Sv r k Schraubstock Vice 3...
Page 89: ...89 7 20 Kusovn k St ckliste Piece list Sv r k Schraubstock Vice 3...
Page 91: ...91 7 22 Kusovn k St ckliste Piece list Podstavec sv r ku Schraubstockuntersatz Vice base...
Page 92: ...92 Manual version 1 01 Nov 2011 Manual rev 2 7 23 Podstavec Untersatz Base...
Page 93: ...93 7 24 Kusovn k St ckliste Piece list Podstavec Untersatz Base...
Page 94: ...94 Manual version 1 01 Nov 2011 Manual rev 2 7 25 V lec zvedac Hebezylinder Lifting cylinder...
Page 95: ...95 7 26 Kusovn k St ckliste Piece list V lec zvedac Hebezylinder Lifting cylinder...
Page 96: ...96 Manual version 1 01 Nov 2011 Manual rev 2 7 27 Kart B rste Brush...
Page 97: ...97 7 28 Kusovn k St ckliste Piece list Kart B rste Brush...
Page 98: ...98 Manual version 1 01 Nov 2011 Manual rev 2 7 29 Rozvad Verteiler Distributor...
Page 99: ...99 7 30 Kusovn k St ckliste Piece list Rozvad Verteiler Distributor...
Page 101: ...101 7 32 Kusovn k St ckliste Piece list Regulace p tlaku Schnittdruckregulation Pressure reg...
Page 102: ...102 Manual version 1 01 Nov 2011 Manual rev 2 7 33 Brzda Bremse Brake...
Page 103: ...103 7 34 Odm ov n Gehrungmessung Measuring...
Page 104: ...104 Manual version 1 01 Nov 2011 Manual rev 2 7 35 Doraz Anschlag Stop piece...
Page 105: ...105 7 36 Pohon Antrieb Drive...