![Bomag BPR 45/55 D Operating Instructions Manual Download Page 40](http://html1.mh-extra.com/html/bomag/bpr-45-55-d/bpr-45-55-d_operating-instructions-manual_2785504040.webp)
Maintenance
BOMAG
40
BPR 45/55 D, BPR 55/65 D
6.4
Running-in instructions
The following maintenance work must be per-
formed when running in new machines or
overhauled engines:
Caution
!
During the running-in period, up to approx. 200
operating hours, check the engine oil level
twice every day.
Depending on the load the engine is subjected
to, the oil consumption will drop to the normal
level after approx. 100 to 200 operating hours.
After approx. 50 operating hours
l
Change the engine oil.
l
Check engine and machine for leaks.
l
Retighten the fastening screws on air filter ex-
haust, fuel tank and other attachments.
l
Retighten the bolted connections on the ma-
chine.
l
Check the vibration drive V-belts.
l
Check the oil level in the vibrator housing.
Summary of Contents for BPR 45/55 D
Page 2: ......
Page 7: ...BOMAG 7 BPR 45 55 D BPR 55 65 D 2 Technical Data...
Page 13: ...BOMAG 13 BPR 45 55 D BPR 55 65 D 3 Safety regulations...
Page 19: ...BOMAG 19 BPR 45 55 D BPR 55 65 D 4 Indicators and Controls...
Page 23: ...BOMAG 23 BPR 45 55 D BPR 55 65 D 5 Operation...
Page 34: ...Operation BOMAG 34 BPR 45 55 D BPR 55 65 D...
Page 35: ...BOMAG 35 BPR 45 55 D BPR 55 65 D 6 Maintenance...
Page 42: ...Maintenance BOMAG 42 BPR 45 55 D BPR 55 65 D...
Page 52: ...Maintenance every 6 months BOMAG 52 BPR 45 55 D BPR 55 65 D...
Page 61: ...BOMAG 61 BPR 45 55 D BPR 55 65 D 7 Trouble shooting...
Page 67: ...BOMAG 67 BPR 45 55 D BPR 55 65 D 8 Disposal...
Page 69: ......
Page 70: ......