17
a)
Connect the batteries to the terminals observing polarity (with the red wires to be connected to
the positive battery leads).
b)
Turn on the mains power 220V, 50 Hz.
c)
Apply 220V power to the box using the QF1 and QF2 circuit breakers.
Monitor the ShPS-12 status against LED indicators.
2.2.6.3.
Turning the ShPS-12 Off
a)
Turn off the QF2 and QF1 circuit breakers.
b)
Disconnect the input 220 V/AC.
c)
Disconnect the batteries.
d)
Disconnect the load.
2.2.7
Performance Testing
2.2.7.1.
A full testing of the ShPS-12 performance is carried out only by the manufacturer or in
special labs.
1)
Turn on the ShPS-12 in line with 2.2.6.2.
2)
Check operation of the ShPS-12, its indicators and its buzzer against the Table 3. Measure the
output voltage at the BK-12; it should be within the range stated in 1.2.4.
3)
Shut off the mains power for a time of 5 minutes at least. Verify that the ShPS has started to be
powered by the batteries. Verify that the indicators and the buzzer operate as stated in Table 3.
Measure the output voltage and verify that it is within the range stated in 1.2.4.
4)
Turn the mains on and verify that the indicators and the buzzer operate as stated in Table 3.
The ShPS-12 is considered to be operational if the requirements of items 2.2.7.1-2) – 2.2.7.1-4) are
met.
2.2.7.2.
ShPS-12’s Batteries Capacity Measurement
To make the capacity measurement available, the battery charge level shall be more than 80%.
Note: The battery charge volume being less than 80%, the ShPS-12 cannot measure the capacity of
installed batteries.
a)
To measure the ShPS-12 battery capacity using the S2000M panel, please use the Test
Detector function (see S2000M Users’ Guide). When initiating a testing command, please specify ‘0’
for detector address and test duration. When this command is received and executed, the ShPS-12
issues the Test Starts event. The test will be completed automatically. With this test being completed,
the ShPS-12 issues the Test Ends event.
To turn the testing procedure on and off:
Enter a pass code.
Select the
Service
item using the
43
buttons and press
, or
press 6 for quick navigation.
Select the
Test System Components
item using the
43
buttons
and press
, or press 3 for quick navigation.
To initiate a test, please select the
Test ON
menu item using
the
43
buttons and press
.
Enter the ShPS-12 address (1 to 127), or select a required one us-
ing the
43
keys and press
.
Enter 0
for the component number and press
.
Enter 0 for the test duration time and press
.
To complete the capacity measurement procedure, please select
the
Test OFF
item using the
43
keys and press
.
Enter the ShPS-12 address (1 to 127), or select the required one
using the
43
keys and press
.
Enter ‘0’ as the component number and press
.
CODE:_
v
6 SERVICE
ADDRESS:_
COMPONENT#:_
TIME, min:_
v
63 TEST SYSTEM COMPONENTS
v
TEST ON
ADDRESS:_
COMPONENT#:_
v
TEST OFF
Summary of Contents for ShPS-12
Page 22: ...23 Schematic for Wiring ShPS 12 mod 10 ShPS 12 mod 11 ShPS 12 mod 12 ...
Page 23: ...24 Appendix B For reference Example No 1 of fitting together equipment within ShPS 12 ...
Page 24: ...25 Appendix C For reference Example No 2 of fitting together equipment within ShPS 12 ...
Page 27: ...28 Appendix F Overall and Mounting Dimensions For ShPS 12 mod 01 and ShPS 12 mod 11 ...
Page 29: ...30 Appendix H For information UProg Window for Programming ShPS 12 ...