0017 00
BOH-PM-07-4
Chapter 4 Rev. 7.01
0017 00-1
OPERATOR MAINTENANCE INSTRUCTIONS
FPU
®
SYSTEMS OPERATION MANUAL
(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST)
MODELS FPU-8-4/BOH-CARGO-12-3 & FPU-20-3
BOH FPU Field Pack-up Units
VERTICAL RACK FRAME
VERTICAL RACK
INITIAL SETUP:
Materiel/Parts
References
None
Chapter 2 WP 0006 00-11 to 00-16
Personnel Required
Equipment Condition
One
FPU SYSTEM Set-up
INSPECT
1. Inspect the vertical rack frame (1) for cracks, excessive dents or bending. Report to maintenance
for repair or replacement.
2. Inspect vertical rack upper attachment (2) and lower attachment assemblies (3) for cracks,
excessive dents or bending. Report to maintenance for repair or replacement.
3. Inspect vertical rack frame for damaged or missing bolts (2) & (3).
4. Report damage to maintenance for repair.
END OF WORK PACKAGE
1
2
3
Summary of Contents for BOH-CARGO-12-3
Page 2: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 4: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 6: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 14: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 16: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 18: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 20: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...