0012 00
BOH-PM-07-4
Chapter 4 Rev. 7.01
0012 00-1
OPERATOR MAINTENANCE INSTRUCTIONS
FPU
®
SYSTEMS OPERATION MANUAL
(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST)
MODELS FPU-8-4/BOH-CARGO-12-3 & FPU-20-3
BOH FPU Field Pack-up Units
INTRODUCTION TO PREVENTATIVE MAINTENANCE CHECKS & SERVICES (PMCS)
INITIAL SETUP:
Materiel/Parts
References
None
None
Personnel Required
Equipment Condition
One
FPU SYSTEMS Set-up
INTRODUCTION TO PREVENTATIVE MAINTENANCE CHECKS & SERVICES (PMCS)
Preventative Maintenance Checks and Services (PMCS) are performed to keep the FPU System
containers in good operating condition. These checks aid in finding, correcting, or reporting problems.
Operator personnel are to perform the PMCS tasks as shown in the PMCS table.
Perform PMCS procedures each day the FPU SYSTEM is in operation, using the PMCS table in (WP
0013 00). There are different intervals to perform PMCS procedures: before, during and after using the
equipment, as well as weekly and monthly. Look at the table carefully to identify the required PMCS
interval.
Perform all checks and services keeping in mind the following guidelines:
•
Before you begin using the FPU SYSTEM, perform
Before Operation PMCS
checks and
services.
•
While the FPU SYSTEM is in use, perform
During Operation PMCS
checks and services.
•
After using the FPU SYSTEM, perform
After Operation PMCS
checks and services
.
If you find something wrong when performing PMCS, fix it using troubleshooting and/or maintenance
procedures. Pay attention to WARNING and CAUTION statements. A
WARNING
means someone could
be injured or killed. A
CAUTION
means equipment could be damaged.
If tools that are required to perform PMCS are not listed in the procedures, notify your supervisor.
Inspection
Look for signs of trouble. Use your senses to feel, smell, hear, or see problems that may exist. Inspect to
see if items are in good condition. Are components correctly installed and secured? Is any damage to
the frame or components visible? Correct any faults or notify Maintenance.
Service
Proper service of the FPU SYSTEM and components is an integral part of maintenance. Regular
cleaning prevents possible problems in the future, so make it a habit to clean the FPU SYSTEM and
components whenever necessary.
END OF WORK PACKAGE
Summary of Contents for BOH-CARGO-12-3
Page 2: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 4: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 6: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 14: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 16: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 18: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...
Page 20: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...