INTRODUCTION TO PREVENTATIVE MAINTENANCE CHECKS & SERVICES (PMCS) 

 

 
INITIAL SETUP: 
Materiel/Parts 

References 

None 

None 

Personnel Required 

Equipment Condition 

One 

FPU SYSTEMS Set-up 

 

INTRODUCTION TO PREVENTATIVE MAINTENANCE CHECKS & SERVICES (PMCS) 

 

Preventative Maintenance Checks and Services (PMCS) are performed to keep the FPU System 
containers in good operating condition. These checks aid in finding, correcting, or reporting problems. 
Operator personnel are to perform the PMCS tasks as shown in the PMCS table. 

 

Perform PMCS procedures each day the FPU SYSTEM is in operation, using the PMCS table in (WP 
0013 00).  There are different intervals to perform PMCS procedures: before, during and after using the 
equipment, as well as weekly and monthly.  Look at the table carefully to identify the required PMCS 
interval. 

 

Perform all checks and services keeping in mind the following guidelines: 

 

Before you begin using the FPU SYSTEM, perform 

Before Operation PMCS 

checks and 

services. 

 

While the FPU SYSTEM is in use, perform 

During Operation PMCS 

checks and services. 

 

After using the FPU SYSTEM, perform 

After Operation PMCS 

checks and services

.

 

 

If you find something wrong when performing PMCS, fix it using troubleshooting and/or maintenance 
procedures.  Pay attention to WARNING and CAUTION statements.  A 

WARNING

 means someone could 

be injured or killed.  A 

CAUTION

 means equipment could be damaged. 

 

If tools that are required to perform PMCS are not listed in the procedures, notify your supervisor. 

 

Inspection 

 

Look for signs of trouble.  Use your senses to feel, smell, hear, or see problems that may exist.  Inspect to 
see if items are in good condition.  Are components correctly installed and secured?  Is any damage to 
the frame or components visible?  Correct any faults or notify Maintenance. 

 

 

Service 

 

Proper service of the FPU SYSTEM and components is an integral part of maintenance.  Regular 
cleaning prevents possible problems in the future, so make it a habit to clean the FPU SYSTEM and 
components whenever necessary. 

 

END OF WORK PACKAGE

 

Summary of Contents for BOH-CARGO-12-3

Page 1: ...H Environmental LLC Chapter 4 Rev 7 01 FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST MODELS FPU 8 4 BOH CARGO 12 3 FPU 20 3 BOH FPU Field Pack up Units CHAPTER 4 OPERATOR MAINT...

Page 2: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Page 3: ...interval Perform all checks and services keeping in mind the following guidelines Before you begin using the FPU SYSTEM perform Before Operation PMCS checks and services While the FPU SYSTEM is in use...

Page 4: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Page 5: ...alt Clean as required Check Horizontal Interconnectors for proper function tightness and debris Clean as required and replace if not functioning properly Damage or malfunction that would cause the FPU...

Page 6: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Page 7: ...covered when cleaning and or lubricating that cannot be corrected using the troubleshooting procedures described in WP 0011 00 should be reported to maintenance for corrective action Table 1 Cleaning...

Page 8: ...thly or as required if under adverse conditions Door Lock Shaft Pivot Bearing Molykote Multipurpose Synthetic Grease P N 26040124 As Required All Temperatures Monthly or as required if under adverse c...

Page 9: ...bricate P N 26040123 As Required All Temperatures Monthly or as Required if Under adverse conditions Vertical Rack Stanchion Recessed Rings FPU 8 4 BOH CARGO 12 3 only General Purpose Lubricating Oil...

Page 10: ...As Required All Temperatures Monthly or as Required if under Adverse Conditions FPU SYSTEM Module Drawer Slam Locks Molykote Multipurpose Synthetic Grease P N 26040124 As Required All Temperatures Mo...

Page 11: ...dder with hand rail INSPECT 1 Open and close right door A left door B refer to chapter 2 pages 0006 00 9 and 00 10 to ensure proper operation and alignment 2 Visually inspect door seals for damage 3 I...

Page 12: ...door B slightly when closed to prevent damage to the door edge seals 4 Notify maintenance of any missing or damaged seals and any problems with operation of latch handle or hinges for service 5 Notify...

Page 13: ...el Parts References None Chapter 2 WP 0005 00 2 and 00 3 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Raise and lower each of the steps 2 to ensure they stow and operate pro...

Page 14: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Page 15: ...WP 0006 00 11 to 00 16 Personnel Required Equipment Condition One FPU SYSTEM Set up INSPECT 1 Inspect the vertical rack frame 1 for cracks excessive dents or bending Report to maintenance for repair...

Page 16: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Page 17: ...to 00 18 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Inspect pallet 1 for cracks excessive dents or sagging report damage to maintenance for repair or replacement 2 Inspec...

Page 18: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Page 19: ...IAL SETUP Materiel Parts References None Chapter 2 WP 0006 00 17 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Remove pallet from container using a forklift 2 Inspect pallet...

Page 20: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Reviews: