2017/12/5V1.4+V1.2
11
5. Assembly steps
◼
STEP1 Assemble main frame and front upright tube set
Install water proof cover (L) into front upright tube set (G) first, then, assemble main frame set
(A) and front upright tube set (G) with screw (K03) and flat (K04). No need to lock tight the
screws yet.