FIG 1
FIG 2
FIG 3
FIG 4
FIG 5
FIG 6
FIG 7
FIG 8
FIG 1
128
128
147
310
304
310
147
147
154
309
309
147
310
FIG 2
302
132
82
FIG 3,5,6
132
154
302
82
FIG 7,8
132
132
301
154
82
309
1. Screw the Double Pulley Bracket (308) into the Top Plate with Selector Rod (94) 10 threads (2cm).
2. Insert the ball end of the Cable Column Cable (314) into the front of the right side Cable Height
Adjuster (304) and out of the top. Then attach two pulleys as shown in Fig 1. Route cable up to Top
Guide Rod Retainer (302) and over pulley mounted as shown in Fig 2.
3. Coutinue along Top Guide Rod Retainer (302) to next pulley as shown in Fig 3. Then down to left side
pulley in Double Pulley Bracket (308) as shown in Fig 4 [STEP1], up to rear side of next pulley in Top
Guide Rod Retainer (302) {exiting toward front}. Then continue routing down to front of right side
pulley in Double Pulley Bracket (308) {exiting toward rear}, then up to front of last pulley in Top Guide
Rod Retainer (302) as shown in Fig 4 [STEP2].
4. Route cable over last pulley in top, exiting toward rear, continue down to pulley mounted behind
Weight Stack Base (301) as shown in Fig 7, under Weight Stack, and around pulley at base next to
column. Finally, route cable up to left side of Cable Height Adjuster (304) and mount pulleys as shown
in Fig 1. Attach removable end to the bolt end of the cable.
IMPORTANT:
Cable length can be adjusted by removing the Bolt on the Top Plate
(95) to turn the Selector Rod (94) to remove slack or further down to
gain length.
CABLE COLUMN CABLE
CABLE COLUMN CABLE (314)
REMOVABLE END (314A)
ball end
bolt end
23
FIG 4
STEP 1
FIG 4
STEP 2
FIG 4
309
308
94
128
154
IMPORTANT
308
95
142