9
P6
P8
P7
P9
P10
CABLE OVERVIEW 2/2
P7
41
59
12
19
15
STEP 4 Install Cable 2/2
P8
3
43
59
41
3
59
P6
P9,P10
1
43
59
59
43
P11
19
19
P11
Fig.1
43
43
59
59
CABLE
(30)
Do Not tighten bolts until told to do so.
Refer to the Boxes above and the CABLE
OVERVIEW drawing at the right for cable routing
and hardware requirements when following the
steps below.
P6
Continuing from Step P5, install Pulley (19) by
halfway removing 3/8" X 3" Hex Bolt (41) being
careful to keep the pulley/cable located next to it in
place. Secure with one 3/8" Nylon Nut (59) as shown
in block P6.
P7
Install Pulley (19) by halfway removing 3/8" X 3"
Hex Bolt (41) being careful to keep the pulley/cable
located next to it in place. Secure with one 3/8" Nylon
Nut (59) as shown in block P7.
P8
Install one Pulley (19) each using one 3/" X 1-3/4"
Hex Bolt (43) and one 3/8" Nylon Nut (59) as shown.
P9
,
P10
Install two Pulleys (19) using one 3/" X 1-
3/4" Hex Bolt (43) and one 3/8" Nylon Nut (59) as
shown.
P11
Install two Pulleys (19) using two 3/8" X 1-3/4"
Hex Bolts (43) and two 3/8" Nylon Nuts (59) as
shown.
IMPORTANT: Adjust Cable Tension
Refer to (Fig.1) Cable (30) length can
be adjusted by turning the 1/2"X
1-3/4" Hex Threaded Bolt (40) at the
top of the machine clockwise to
remove slack. Adjust counter-
clockwise to add slack.
Cable Installation is Complete! TIGHTEN ALL
FRAME AND PULLEY BOLTS AT THIS TIME.