
18
S T E P
4
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware first in this step. Wrench tighten ALL hardware at the end of
STEP 4E. Some components may be pre-assembled. Nylon lock nuts will not fully screw
onto bolts, they must be wrench tighten to fully go on.
4A.
Route Cable
(44)
and install one
ø90
mm Pulleys
(21)
on
Weight
Rotating Tube
(J)
per Step 4 Drawing
using:
1 - (#7) M10x50mm Hex Head Bolt
1 - (#13) M10 Nylon Lock Nut
2 - (#15) M10 Flat Washer
2 - (#18) Pulley Spacer
ø15
x
ø11
x5mm
4B.
Attach Press Arms
(G & H)
and Logo Plate
(S)
together using:
2 - (#5) M10x75mm Carriage Bolt
2 - (#15) M10 Flat Washer
2 - (#13) M10 Nylon Lock Nut
4C.
Attach Press Arms
(G & H)
to Upper Upright
(K)
using:
1 - (#42) Shaft
2 - (#14) M12 Flat Washer
2 - (#12) M12 Nylon Lock Nut
4D.
Insert Adjustment Bar
(T)
into one of the adjustment holes of Upper
Upright
(K)
to support Press Arms
(G & H)
.
4E.
Attach two Chrome Weight Horns
(R)
to Press Arms
(G & H)
using:
2 - (#8) M10x20mm Button Head Cap Screw
2 - (#16) M10 Lock Washer
2 - (#17) M10 Large O.D. Flat Washer
4F.
Insert two Round End Caps
(32)
onto two Chrome Weight Horns
(R)
.
Summary of Contents for GLGS100
Page 1: ... A s s e m b l y I n s t r u c t i o n s O W N E R S M A N U A L V GLGS100 102914 GLGS100 ...
Page 13: ...S T E P 1 Above shows Step 1 assembled and completed 13 ...
Page 15: ...S T E P 2 Above shows Step 2 assembled and completed 15 ...
Page 17: ...S T E P 3 Above shows Step 3 assembled and completed 17 ...
Page 19: ...S T E P 4 Above shows Step 4 assembled and completed 19 ...
Page 21: ...S T E P 5 Above shows Step 5 assembled and completed 21 ...
Page 22: ...45 22 N o t e s ...