
14
S T E P
2
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware first in this step. Wrench tighten ALL hardware at the end of
STEP 2D. Some components may be pre-assembled. Nylon lock nuts will not fully screw
onto bolts, they must be wrench tighten to fully go on.
2A.
Attach Left & Right Support Frames
(F & E)
to Left & Right Base Frame
(B & C)
using:
4 - (#1) M12x100mm Hex Head Bolt
8 - (#14) M12 Flat Washer
4 - (#12) M12 Nylon Lock Nut
2B.
Attach Upper Upright
(K)
to Lower Upright
(A)
, Left & Right Support
Frames
(F & E)
using:
8 - (#2) M12x25mm Hex Head Bolt
8 - (#14) M12 Flat Washer
2C.
Attach Rubber Bumper
(30)
to Lower Upright
(A)
using:
1 - (#9) M6x20mm Button Head Cap Screw
2D.
Route Cable
(44)
and Install one
ø110
mm Pulley
(20)
and three
ø90
mm Pulleys
(21)
on Uprights
(A & K)
per Step 2 Drawing
using:
1 - (#3) M10x90mm Hex Head Bolt
3 - (#7) M10x50mm Hex Head Bolt
4 - (#13) M10 Nylon Lock Nut
8 - (#15) M10 Flat Washer
6 - (#18) Pulley Spacer
ø15
x
ø11
x5mm
2 - (#19) Pulley Spacer
ø15
x
ø11
x25mm
NOTE:
1. A Hook is provided to assist you to fish the Cable out of the Lower Upright.
2. Before wrench tightening the hardware, please make sure the machine is
leveled and the upright is straight.
Summary of Contents for GLGS100
Page 1: ... A s s e m b l y I n s t r u c t i o n s O W N E R S M A N U A L V GLGS100 102914 GLGS100 ...
Page 13: ...S T E P 1 Above shows Step 1 assembled and completed 13 ...
Page 15: ...S T E P 2 Above shows Step 2 assembled and completed 15 ...
Page 17: ...S T E P 3 Above shows Step 3 assembled and completed 17 ...
Page 19: ...S T E P 4 Above shows Step 4 assembled and completed 19 ...
Page 21: ...S T E P 5 Above shows Step 5 assembled and completed 21 ...
Page 22: ...45 22 N o t e s ...