Material Lift LMX / LHX 

 
 

 

 

       

 

105000017

 

5

 

 

Transport 

2.1  Conditions of transport 

In order to prevent damage or life-threatening injuries during the transport of the material and 
installation lifts, it is imperative that the following points are observed: 

 

Transport works must only be carried out by qualified personnel in accordance with the 
safety instructions and in compliance with the unladen weight of the material-installation 
lift, using a sufficient number of people. 

 

For  the transportation  of the material-installation  lifts  and  associated component  parts 
only appropriate means of transport and suitable load handling attachments and lifting 
tackle must be used. 

 

Prior to moving, check if any potential parking brakes must be released. After relocating, 
the parking brakes must be applied. 

 

During transport, the permitted floor load must be observed! 

 

It is generally prohibited to be positioned below suspended loads! 

 

Ensure that your vehicle  is  suitable for the  transportation  of these material-installation 
lifts.  Check  if  your  load  securing  equipment  (e.g.  lashing  straps)  is  sufficient  to 
appropriately  secure  the  load.  The  loading  process  must  only  be  carried  out  on  level 
surfaces. 

 

The  material-installation  lifts  must  be  sufficiently  secured  on  the  loading  area  of  your 
vehicle. 

 

The integrated wheels in the front parts are not designed for bearing permanent loads! 

2.2  Transportation risks 

During  the  transport  of  the  material-installation  lifts,  the  following  specific  hazards  must  be 
expected: 

 

Improper moving of the material lifts may result in injury to persons or damage to objects. 

 

To prevent accidents, always ensure that you have a clear view in the driving direction 
and that there are no people in the transport area. Depending on the circumstances, at 
least one further person is required for safety purposes. 

 

If the  proper  load  handling  equipment  is  not  used, the material-installation  lift may  be 
severely damaged. 

 

Should  a  component  of  the  material  lift  be  damaged  or  disabled  during  transport, 
commissioning of the material-installation lift is not permitted, as the consequences are 
not calculable. The lift may only be commissioned when the damage has been properly 
repaired. 

 

Make  sure  that  all  parking  brakes  have  been  engaged  after  transportation,  as  the 
material lift could otherwise begin to move automatically. 

 

 

Summary of Contents for LHX 330

Page 1: ...Original Manufacturer Operating and Maintenance Instructions GB Material Lifts LMX LHX LMX 500 LHX 330 LHX 500 105000017...

Page 2: ...f the German original operating instructions Document No 105000017 Version 06 04 2022 Manufacturer B cker Maschinenwerke GmbH Lippestr 69 73 DE 59368 Werne Tel 49 2389 7989 0 Fax 49 2389 7989 9000 inf...

Page 3: ...4 Commissioning 10 5 Operation of LMX LHX 12 6 Safety 14 6 1 Safety instructions for assembly commissioning operation and maintenance14 6 2 Monitoring of the safety devices 14 6 3 General safety inst...

Page 4: ...must only be used on level surfaces and load bearing substrate irrespective of whether they are used within or outside of closed spaces Prior to using the unit please ensure that there are no steep s...

Page 5: ...g straps is sufficient to appropriately secure the load The loading process must only be carried out on level surfaces The material installation lifts must be sufficiently secured on the loading area...

Page 6: ...Fig 2 Transport position Ensure that your vehicle is suitable for the transportation of these material lifts Check if your load securing equipment e g lashing straps is sufficient to appropriately se...

Page 7: ...unloading from the transport vehicle or during the removal of the material lift from the storage site move it with the black wheels 250mm For this purpose carefully tilt the material lift backwards h...

Page 8: ...ave been properly mounted there Prior to the start of the setting up work all components must be checked for transport damage Pay particular attention to the cable guide Danger slack cable It must be...

Page 9: ...and if necessary keep the same back to prevent tipping of the material lift If you wish to set the unit to the transport position follow the steps for the setting up in reverse order For storing the...

Page 10: ...dance wire cable is not running in the pulley the commissioning or operating of the equipment is prohibited or must be stopped immediately Unbolt the carriage by pulling out the rail safety mechanism...

Page 11: ...ple fig 5 LMX the lift can be levelled off The unit must be level on all sides Fig 3 Rail safety mechanism Fig 4 Crane fork Fig 5 Spirit level above winch Fig 6 Lateral outriggers with spindle Follow...

Page 12: ...able diameter can be spooled This avoids overloading the winch and the cable running off at the side of the drum It is important to ensure that the wire rope is correctly wound onto the winding drum W...

Page 13: ...and tear After the work is completed and the unit is left it must be secured against unintended use lock on circuit breaker WARNING The load must be secured on the crane fork with appropriate load sec...

Page 14: ...anism snap in Set up and place appropriate warning signs cordon off or secure the area The operator must ensure that the safe condition of protection systems and locks at the material lift are checked...

Page 15: ...th the front components the manual winch or the hydraulic winch Hydr functional components e g hoses screw fittings motor brakes and similar the castors and wheels the fixing elements e g screws nuts...

Page 16: ...tc B cker Maschinenwerke GmbH does not accept any liability for damage attributable to such actions These are carried out solely at the risk of the user Operating and maintenance tasks must only be ca...

Page 17: ...t for deformation or damage corrosion or oxidation and tears in welding seams or components Protect the lift from contamination rain and other weather effects The mast elements made of aluminium shoul...

Page 18: ...erational circumstances however at least once every year annual occupational safety inspection in accordance with UVV These operating instructions are expressly a part of the material lifts and must a...

Page 19: ...ope drum Pulleys or pulley bearings are defective The pulley does not turn properly or not at all Plastic pulleys or plastic pulley bearings are defective The plastic pulley bearings do not turn prope...

Page 20: ...potentially no longer be ensured Modifications and alterations not carried out by us release us from any responsibility in the event of any damage In the event of repair or procurement of replacement...

Page 21: ...ctions only splices spelter sockets aluminium pressed sleeves rope locks or wedge sockets may be used Rope locks must be manufactured with an inlaid thimble Additional requirements for mechanical powe...

Page 22: ...unimpeded The proper condition of outriggers on suitable ground must be checked prior to the commissioning of the lifting platform Power operated outriggers must be observed during extending and retra...

Page 23: ...as lifting platforms if they conform with the provisions of these accident prevention regulations Decommissioning Section 51 Lifting platforms that are operated and moved with power must be secured a...

Page 24: ...m mm 4350 Carrying capacity kg 500 H Length of crane fork mm 650 I Width of crane fork mm 560 E Length of chassis mm 1610 F Width of chassis mm 760 G Width of chassis incl outriggers mm 1920 C Height...

Page 25: ...he bottom mm 2880 4310 Carrying capacity kg 500 Length of crane fork mm 585 Length of chassis mm 1610 Width of chassis centre of spindle mm 1780 Height of mast mm 1975 Length of transport mm 765 Width...

Page 26: ...nection with the B cker material lift LMX 500 the following must be observed CAUTION Risk of tipping It is imperative to consider the wind force if using outdoors At a wind force higher than wind forc...

Page 27: ...mmissioning 10 D Description 4 I Inspection 17 Installation 8 M Maintenance 17 Malfunction 19 O Operation 12 R Replacement parts 20 S Safety 14 Safety devices 14 Safety regulations 21 T Technical data...

Reviews: