Material Lift LMX / LHX
105000017
19
8
Conduct in case of malfunction
Before commencing work, check if the mast components are running upwards in the correct
sequence. First, the carriage must lift up, then the front mast, then the 2. mast etc. The
sequence during lowering is reversed. If the sequence changes, this should be checked
immediately.
Potential causes:
•
The wire cable has jumped from the pulley.
•
The wire rope is not correctly wound on the rope drum
•
Pulleys or pulley bearings are defective.
•
The pulley does not turn properly or not at all.
•
Plastic pulleys or plastic pulley bearings are defective.
•
The plastic pulley bearings do not turn properly or not at all.
•
There is dirt and rubbish between the mast components or on the pulleys.
•
Damaged mast cable or carriage.
•
Overloading or one-sided load.
It is imperative to remove the cause and restore the correct sequence. In case of queries
regarding the unit you can call us at any time.
Böcker Maschinenwerke GmbH
Lippestraße 69-73
59368 Werne
Federal Republic of Germany
Tel. +49 ( 0 ) 2389 7989-0
Fax +49 ( 0 ) 2389 7989-9000
e-mail [email protected]