![BOC E2M28 Instruction Manual Download Page 8](http://html1.mh-extra.com/html/boc/e2m28/e2m28_instruction-manual_2781946008.webp)
E2M28 and E2M30 Rotary Vacuum Pumps
INT
R
ODUCTI
ON
PAGE
2
Issue K
2
Jul 05
1.2
ATEX directive implications
•
This equipment is designed to meet the requirements of Group II Category 3 equipment in
accordance with Directive 94/9/EC of the European Parliament and the Council of 23rd March 1994
on the approximation of the laws of the Member States concerning equipment and protective
systems intended for use in potentially explosive atmospheres. (The ATEX Directive)
The ATEX Category 3 applies in respect of potential ignition sources internal to the equipment. An
ATEX Category has not been assigned in respect of potential ignition sources on the outside of the
equipment as the equipment has not been designed for use where there is an external potentially
explosive atmosphere.
There is no potential source of ignition within the pump during normal operation but there may be
potential sources of ignition under conditions of predictable and rare malfunction as defined in the
Directive. Accordingly, although the pump is designed to pump flammable materials and mixtures,
operating procedures should ensure that under all normal and reasonably predictable conditions,
these materials and mixtures are not within explosive limits. Category 3 is considered appropriate
for the avoidance of ignition in the case of a rare malfunction which allows flammable materials or
mixtures to pass through the pump while within their explosive limits.
•
When flammable or pyrophoric materials are present within the equipment you must:
•
Not allow air to enter the equipment.
•
Ensure that the system is leak tight.
•
Use an inert gas purge (for example, a nitrogen purge) to dilute any flammable gases or
vapours entering the pump inlet, and/or use an inert gas purge to reduce the concentration
of flammable gases or vapours in the pump and in the exhaust pipeline to less than one quarter
of the gases' published lower explosive limits (LEL).
•
For further information, please contact BOC Edwards: refer to the Addresses page at the end of
this manual for details of your nearest BOC Edwards company.
Summary of Contents for E2M28
Page 6: ...E2M28 and E2M30 Rotary Vacuum Pumps PAGE iv Issue K iv Jul 05 This page intentionally blank...
Page 16: ...E2M28 and E2M30 Rotary Vacuum Pumps PAGE 10 Issue K 10 Jul 05 This page intentionally blank...
Page 34: ...E2M28 and E2M30 Rotary Vacuum Pumps PAGE 28 Issue K 28 Jul 05 This page intentionally blank...
Page 42: ...E2M28 and E2M30 Rotary Vacuum Pumps PAGE 36 Issue K 36 Jul 05 This page intentionally blank...
Page 44: ...E2M28 and E2M30 Rotary Vacuum Pumps PAGE 38 Issue K 38 Jul 05 This page intentionally blank...
Page 51: ...This page intentionally blank...