27
11.
Open up the exterior wall.
12.
Insert Ignis-Protect so that it fits
perfectly. The side laminated with
foil should be facing inwards!
No gaps should be
left in the studwork
or the surrounding
thermal insulation!
TIP:
If necessary correct the opening.
Replace the thermal insulation right
around the assembly opening in the
studwork.
IMPORTANT: follow the
safe working notes on page 29.
10.
15.
View of the finished vapour barrier
sealed tightly all round.
Check width of the opening: 565mm
NOTE: Ignis-Protect must not be
shortened on site!
8.
13.
With Ignis-Protect in place, cut away
the vapour barrier flush to the edges.
Check height of the opening (see
image 2.)
NOTE: Ignis-Protect must
not be shortened on site!
9.
14.
Secure the junctions with the vapour
barrier by applying appropriate sealing
tape to the foil lamination.