635 W. Michigan Street Orlando, FL 32805 · PH 407-426-7674 · Fax 407-426-7721
Page 3 of 8
Fig 2.1
Section 1- Initial Prepping
1.
Carefully remove and inspect all your Classic Quarry components from its shipping carton.
Do not operate
unit if any parts are damaged. Please retain all packaging until your unit is installed correctly and
running successfully. You may leave the stone on the pallet until ready to hang.
2.
It is very important to rinse your stone clean of any dust or chips that may have accumulated during shipping
prior to assembling your fountain.
3.
Tools required: Level, Pencil, stud finder, drill with Phillips bit, Phillips Screwdriver, and Measuring Tape.
4.
5 gallons of distilled water is strongly recommended.
Section 2- Mounting the brackets
1.
Your fountain is 58” tall x 25.5” wide. Determine where on the wall the fountain will be mounted. You may
wish to block out the dimensions with low tack or painters masking tape for reference. The fountain must be
mounted into studs, wood or metal. Using the stud finder locate and mark the position of the vertical and
horizontal studs within the blocked out installation area. Once the studs have been located, the brackets can
be installed.
2.
Mark the center of the fountain’s width 12.75” (half the 25.5”overall fountain width) for reference. Using your
level mark this line vertically within the installation area.
3.
Identify the Bracket Template (A) piece from the fountain components. The top of the bracket will
rest exactly 4” down from the overall height of your fountain. Using the center mark of the
fountain’s width place the Bracket Template‘s (A) upper keyhole so you can see the center line
through the hole. The keyholes should be in this position (Fig 2.1). Mark the top keyhole.
4.
Using a Phillips screw driver and a small screw from your hardware bag (J) set the screw in the wall so that ¼”
is left protruding. Hang the Bracket Template (A) from this screw making certain the keyhole is in the position
shown in Fig 2.1.
5.
Using the level make certain the Bracket Template (A) is vertically level and mark the placement of the lower
keyhole. Remove the Bracket Template (A).
6.
Again using a Phillips screw driver and a small screw, set the screw in the wall so that ¼” is left protruding.
7.
Hang the Stone Wall Bracket (B) from the center keyhole on the upper screw. Note the position of the
marked wall studs through the
numerous bracket holes.
8.
Place the level on the top of the
stone wall bracket (B) ensuring it is
level. Mark the holes that align
with the wall studs. The ideal
bracket installation would include
screws located at the bracket’s left
top and bottom, right top and
bottom and center. If you do not
have studs as these locations you
will need to use the EZ Anchors™
(J) to complete the stone wall
bracket (B) installation at these
locations. Remove the screw that was used to hang the bracket template (A).
9.
Repeat this procedure for the reservoir wall bracket (D).