background image

 

 

635 W. Michigan Street Orlando, FL 32805 · PH 407-426-7674 · Fax 407-426-7721 

Page 3 of 8 

 

 

 

Fig 2.1 

 

Section 1- Initial Prepping

 

 

1.

 

Carefully remove and inspect all your Classic Quarry components from its shipping carton.  

Do not operate 

unit if any parts are damaged.  Please retain all packaging until your unit is installed correctly and 
running successfully.  You may leave the stone on the pallet until ready to hang.  

2.

 

It is very important to rinse your stone clean of any dust or chips that may have accumulated during shipping 
prior to assembling your fountain.

 

3.

 

Tools required:  Level, Pencil, stud finder, drill with Phillips bit, Phillips Screwdriver, and Measuring Tape. 

4.

 

5 gallons of distilled water is strongly recommended. 

 

 

 

Section 2- Mounting the brackets 

1.

 

Your fountain is 58” tall x 25.5” wide.  Determine where on the wall the fountain will be mounted.  You may 
wish to block out the dimensions with low tack or painters masking tape for reference.  The fountain must be 
mounted into studs, wood or metal.  Using the stud finder locate and mark the position of the vertical and 
horizontal studs within the blocked out installation area.  Once the studs have been located, the brackets can 
be installed.   

2.

 

Mark the center of the fountain’s width 12.75” (half the 25.5”overall fountain width) for reference.  Using your 
level mark this line vertically within the installation area.  

3.

 

Identify the Bracket Template (A) piece from the fountain components.  The top of the bracket will 
rest exactly 4” down from the overall height of your fountain.  Using the center mark of the 
fountain’s width place the Bracket Template‘s  (A)  upper keyhole so you can see the center line 
through the hole.  The keyholes should be in this position (Fig 2.1).  Mark the top keyhole. 

 

4.

 

Using a Phillips screw driver and a small screw from your hardware bag (J) set the screw in the wall so that ¼” 
is left protruding. Hang the Bracket Template (A) from this screw making certain the keyhole is in the position 
shown in Fig 2.1.  

5.

 

Using the level make certain the Bracket Template (A) is vertically level and mark the placement of the lower 
keyhole. Remove the Bracket Template (A). 

6.

 

Again using a Phillips screw driver and a small screw, set the screw in the wall so that ¼” is left protruding.  

7.

 

Hang the Stone Wall Bracket  (B)  from the center keyhole on the upper screw.   Note the position of the 
marked wall studs through the 
numerous bracket holes.  

8.

 

Place the level on the top of the 
stone wall bracket (B) ensuring it is 
level. Mark the holes that align 
with the wall studs. The ideal 
bracket installation would include 
screws located at the bracket’s left 
top and bottom, right top and 
bottom and center. If you do not 
have studs as these locations you 
will need to use the EZ Anchors™ 
(J)  to complete the stone  wall 
bracket  (B)  installation at these 
locations. Remove the screw that was used to hang the bracket template (A). 

9.

 

Repeat this procedure for the reservoir wall bracket (D). 

 

Summary of Contents for CLASSIC QUARRY NOJOQUI FALLS

Page 1: ...ion booklet Check it very carefully In the unlikely event that any components are damaged or missing please contact our customer service hotline at 407 426 7674 extension 2003 Do not install unit if d...

Page 2: ...end that a GFI outlet be used The fountain should not be used outdoors b When considering the location of your fountain please consider making it easily accessible for maintenance e g adding water cle...

Page 3: ...ion area 3 Identify the Bracket Template A piece from the fountain components The top of the bracket will rest exactly 4 down from the overall height of your fountain Using the center mark of the foun...

Page 4: ...two tabs on the disperser E behind the bracket template A so it is holding up the disperser E Do not push the disperser E all the way down just enough so that is doesn t fall 4 Place the vinyl tubing...

Page 5: ...m behind the stone wall bracket A Slide the tabs on the disperser E behind the stone and into the pocket clips on the stone wall bracket B The disperser E should sit evenly along the angle on the ston...

Page 6: ...oir L Section 5 Installing the Light Kit 1 Carefully unwrap the LED light bar K Take care in handling so that the LED strips and connections to transformers are not disturbed 2 Remove the tie from the...

Page 7: ...ver material ABS c Fabrication processing multicolor printing UV varnish 2 Technical Parameters controller a Working voltage DC 12V 24V b Output control 1circuit c 6A circuit d Dimension L85 W64 H24 e...

Page 8: ...t forth in those documents Please be aware that you may have valuable rights under the state law in which you reside Some of the provisions of this Warranty may be prohibited by your state law in whic...

Reviews: