background image

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN 
FOR CLAD CASEMENT & AWNING WINDOW
VENTANA DE DOS HOJAS CON REVESTIMIENTO

Installation Instructions for Typical Wood Frame Construction.

These instructions were developed and tested for use with typical wood frame wall construction 
in a wall system designed to manage water. These instructions are not to be used with any 
other construction method. Installation instructions for use with other construction methods, 
multiple units or bow and bay windows, may be obtained from Pella Corporation, a local Pella 
retailer, or by visiting 

http://www.pella.com

. Building designs, construction methods, building 

materials, and site conditions unique to your project may require an installation method 
different from these instructions and additional care. Determining the appropriate installation 
method is the responsibility of you, your architect, or construction professional. 

Framing

Corner
Flashing
Tape

Top
Flashing
Tape

Corner
Flashing
Tape

Fin
Corner

Window Top

Nailing Fin

Window Bottom

Side
Flashing
Tape

Side
Flashing
Tape

Sill Flashing Tape #2

Sill Flashing Tape #1

Water Resistive Barrier

Sheathing

Part Number: 801P0101

© 2008 Pella Corporation 

Always read the Pella

®

 Limited Warranty before purchasing or installing Pella products. 

By installing this product, you are acknowledging that this Limited Warranty is part of the terms of 
the sale. Failure to comply with all Pella installation and maintenance instructions may void your Pella 
product warranty. See Limited Warranty for complete details at 

http://warranty.pella.com.

Summary of Contents for 801P0101

Page 1: ...ue to your project may require an installation method different from these instructions and additional care Determining the appropriate installation method is the responsibility of you your architect...

Page 2: ...1 ROUGH OPENING PREPARATION A Verify the opening is plumb and level Note It is critical that the bottom is level B Verify the window will t the opening Measure all four sides of the opening to make S...

Page 3: ...grilles or hardware are removed from the window at this time label them and store them in a protected area 1 ROUGH OPENING PREPARATION CONTINUED F Tab the sill ashing tape and fold UT WIDE TABS AT EAC...

Page 4: ...bottom and top of the window between the window and the sides of the opening Adjust the shims as required to plumb and square the window in the opening If the frame height EXCEEDS PLACE SHIMS AT THE...

Page 5: ...ration VENT UNITS ONLY BY OPENING AND CLOSING the window Note If the window does not operate correctly check to make sure it is still plumb level square and that the sides are not bowed If adjustments...

Page 6: ...Perimeter Sealant must extend to room side of Accessory Groove Accessory Groove Sealant typical 3 8 Min 3 8 BRICK VENEER 3 8 Clearance Backer Rod and Sealant typical Perimeter Sealant must extend to...

Page 7: ...use tools that might damage the surface 5SE OF INAPPROPRIATE lNISHES SOLVENTS BRICKWASH OR CLEANING CHEMICALS WILL CAUSE ADVERSE reactions with window and door materials and voids the Limited Warrant...

Page 8: ...NAL INSTALLATION FOLD THE CRANK OVER AND snap the knob into the pocket Note Even with the window open the crank can be folded to avoid interfering with the window treatments Crank Handle C D Operator...

Reviews: