background image

4

 INTERIOR SEAL

Caution: Ensure use of low pressure polyurethane window and door insulating foams and 
strictly follow the foam manufacturer’s recommendations for application. Use of high pressure 
foams or improper application of the foam may cause the window frame to bow and hinder 
operation.

A. 

Apply insulating foam sealant

&ROMTHEINTERIORINSERTTHENOZZLE

OFTHEAPPLICATORAPPROXIMATELYDEEPINTOTHESPACEBETWEENTHE

WINDOWANDTHEROUGHOPENINGANDAPPLYADEEPBEADOFFOAM

4HISWILLALLOWROOMFOREXPANSIONOFTHEFOAMANDWILLMINIMIZE

SQUEEZEOUT)FUSINGFOAMOTHERTHAN'REAT3TUFF

 Window and 

Door Insulation Foam Sealant by the Dow Chemical Company, 

ALLOWTHEFOAMTODRYCOMPLETELYUSUALLYTOHOURS BEFORE

PROCEEDINGTOTHENEXTSTEP

Note: DO NOT completely fill the space from the back of the fin 
to the interior face of the opening. 

B. 

Check window operation

VENTUNITSONLY BYOPENINGANDCLOSING

the window.

Note: If the window does not operate correctly, check to make sure it is still plumb, level, 
square and that the sides are not bowed. If adjustments are required, remove the foam 
with a serrated knife. Adjust the shims, and reapply the insulating foam sealant.

Interior

4A

B. 

Apply top flashing tape

. Cut a piece of flashing tape long enough 

TOGOACROSSTHETOPOFTHEWINDOWANDEXTENDATLEASTPAST

THESIDEmASHINGTAPEONBOTHSIDES!PPLYTHETAPEONTO

THEFRAMECLADDINGOVERTHETOPNAILINGlNASSHOWN&OLDTHE

OVERLAPPINGTAPEDOWNANDPRESSALLTAPEDOWNlRMLY

Note: DO NOT tape or seal the bottom nailing fin.

Π

Π

Î

Î

Î

C. 

Fold down top flap

OFWATERRESISTIVEBARRIER#

D. 

Apply flashing tape to diagonal cuts

. Cut pieces of 

mASHINGTAPEATLEASTLONGERTHANTHEDIAGONALCUTSINTHE

water resistive barrier. Apply the tape covering the entire 
diagonal cut in the water resistive barrier at both upper 
corners of the window.

Note: Be sure to overlap the top corners (3D).

3

 

INTEGRATING THE WINDOW TO THE 

 

WATER RESISTIVE BARRIER (continued)

Summary of Contents for 801P0101

Page 1: ...ue to your project may require an installation method different from these instructions and additional care Determining the appropriate installation method is the responsibility of you your architect...

Page 2: ...1 ROUGH OPENING PREPARATION A Verify the opening is plumb and level Note It is critical that the bottom is level B Verify the window will t the opening Measure all four sides of the opening to make S...

Page 3: ...grilles or hardware are removed from the window at this time label them and store them in a protected area 1 ROUGH OPENING PREPARATION CONTINUED F Tab the sill ashing tape and fold UT WIDE TABS AT EAC...

Page 4: ...bottom and top of the window between the window and the sides of the opening Adjust the shims as required to plumb and square the window in the opening If the frame height EXCEEDS PLACE SHIMS AT THE...

Page 5: ...ration VENT UNITS ONLY BY OPENING AND CLOSING the window Note If the window does not operate correctly check to make sure it is still plumb level square and that the sides are not bowed If adjustments...

Page 6: ...Perimeter Sealant must extend to room side of Accessory Groove Accessory Groove Sealant typical 3 8 Min 3 8 BRICK VENEER 3 8 Clearance Backer Rod and Sealant typical Perimeter Sealant must extend to...

Page 7: ...use tools that might damage the surface 5SE OF INAPPROPRIATE lNISHES SOLVENTS BRICKWASH OR CLEANING CHEMICALS WILL CAUSE ADVERSE reactions with window and door materials and voids the Limited Warrant...

Page 8: ...NAL INSTALLATION FOLD THE CRANK OVER AND snap the knob into the pocket Note Even with the window open the crank can be folded to avoid interfering with the window treatments Crank Handle C D Operator...

Reviews: