background image

INSTALLING ROTO COVER AND CRANK

Note: Finish the interior of the window and allow 
the window to dry before proceeding with these 
instructions. (To open the window for finishing, 
partially insert the lock handle into the jamb, 
unlock the unit, temporarily attach the crank 
handle and turn to open.)

A.  Place the cover over the operator stud and snap 

into place.

B.  Apply pressure to the pocket end of the cover and 

snap into place.

# 5SEAMEDIUMSIZEmATBLADESCREWDRIVERTOLOOSEN

the set screw in the crank handle.

D. Slide the crank handle onto the stud. Unlock, open 

window, then close and lock window.

E.  Fold the crank handle down and check alignment 

of knob with the pocket.

Note: You may need to adjust the crank position 
on the stud until the correct alignment is 
achieved.

F.  Open the crank and tighten the set screw.

'!FTERTHElNALINSTALLATIONFOLDTHECRANKOVERAND

snap the knob into the pocket.

Note: Even with the window open the crank can 
be folded to avoid interfering with the window 
treatments.

Crank Handle

C

D

Operator Stud

Set Screw

A

B

Pocket End

Operator Stud

Knob

E

Pocket

LOCK LEVER REMOVAL AND INSERTION

Note: You may want to remove the lock lever prior to finishing the window, 
or if it needs to be replaced with a lock lever in a different finish.

A.  Unlock and open the window.

B.  Place the lock lever in the locked position.

# &ROMTHEEXTERIOROFTHEWINDOWINSERTASMALLmAT

blade screwdriver into the slot behind the lock lever.

D. Pry the cam away from the side of the window by 

rotating the screwdriver a quarter turn.

Note: This will release the hook in the lever from 
the cam hook.

E.  Remove the lock lever by pulling it toward the 

interior of the building.

F.  To install a lock lever, hold it in the lock position 

and insert it, from the interior, into the slot until it 
snaps into the cam.

Interior

B

Exterior

C

Interior

F

Exterior

E

D

Summary of Contents for 801P0101

Page 1: ...ue to your project may require an installation method different from these instructions and additional care Determining the appropriate installation method is the responsibility of you your architect...

Page 2: ...1 ROUGH OPENING PREPARATION A Verify the opening is plumb and level Note It is critical that the bottom is level B Verify the window will t the opening Measure all four sides of the opening to make S...

Page 3: ...grilles or hardware are removed from the window at this time label them and store them in a protected area 1 ROUGH OPENING PREPARATION CONTINUED F Tab the sill ashing tape and fold UT WIDE TABS AT EAC...

Page 4: ...bottom and top of the window between the window and the sides of the opening Adjust the shims as required to plumb and square the window in the opening If the frame height EXCEEDS PLACE SHIMS AT THE...

Page 5: ...ration VENT UNITS ONLY BY OPENING AND CLOSING the window Note If the window does not operate correctly check to make sure it is still plumb level square and that the sides are not bowed If adjustments...

Page 6: ...Perimeter Sealant must extend to room side of Accessory Groove Accessory Groove Sealant typical 3 8 Min 3 8 BRICK VENEER 3 8 Clearance Backer Rod and Sealant typical Perimeter Sealant must extend to...

Page 7: ...use tools that might damage the surface 5SE OF INAPPROPRIATE lNISHES SOLVENTS BRICKWASH OR CLEANING CHEMICALS WILL CAUSE ADVERSE reactions with window and door materials and voids the Limited Warrant...

Page 8: ...NAL INSTALLATION FOLD THE CRANK OVER AND snap the knob into the pocket Note Even with the window open the crank can be folded to avoid interfering with the window treatments Crank Handle C D Operator...

Reviews: