21
* Installation Touch model. All of the operations
must be carried out exclusively by qualified technical
personnel. To view the video tutorial, scan the QR code.
* Installation Light model. All of the operations must be
carried out exclusively by qualified technical personnel.
To view the video tutorial, scan the QR code.
Unpacking
Remove the two plastic tape.
Lift the internal cardboard box up
and out of the cage. Carefully check
that the watercooler has not been
damaged during transport. Any signs of
damage must be reported to the Agent
immediately.
If the watercooler has been transported in
a horizontal or inclined position, a wait of
8 hours is needed before turning it on so
that the refrigeration circuit can function
perfectly.
Ensure that a qualified technician
connects it to the electric supply following
the manufacturer’s instructions and
according to the local safety regulations
The end user is not permitted to access
the internal service parts of the unit. Only
technical personnel should carry out
operations of this nature.
Installation
Summary of Contents for WAVE I.T.
Page 1: ...1 6 0 0 0 9 1 5 0 3 EN mod Touch I T Light WAVE Us e M a i n t e n a n c e M a n u a l...
Page 2: ......
Page 33: ......
Page 34: ......
Page 35: ...160009 Rev 01 23 04 2016 11 59...