877-411-6278
Page
33
AL1 / AL2 Standard Series User Manual
Primary Guying Only (2 - 10 Meters)
12. Attach the Primary Guy Ropes (continued)
F. Attach the stainless steel clip on the free end of the 2
nd
primary guy rope to the SQUARE
HOLE opposite the round hole on the red primary guy ring.
G. Unwind the 2
nd
primary guy rope (opposite of 1
st
primary guy rope) at the same number
of NORMAL steps you used for the first guy rope. Do not use exaggerated steps.
H. Visually confirm that the 2
nd
primary guy rope is in line with the 1
st
primary guy rope
directly opposite the tripod.
I. Drive a guy stake into the ground and clip the free end of the guy rope to the stake.
J. For mast heights of 10+ meters - Slide the handle towards the mast approx. 7 feet. This
will take up the slack in the guy rope during deployment and prepare you for incremental
guying (if required).
Helpful Hint:
If you are deploying the mast to a shorter height than the purchased height or are
in a tight spot, then see the guying addendum in this manual for help in determining your spacing
and load specs.
K. Repeat the steps above until all four primary guy ropes have been properly deployed 90
Degrees from each other.
L. When all guys have been deployed, inspect the spacing and orientation and make any
adjustments now.
12.I
12.J
12.G
12.K
12.K
Summary of Contents for AL1 STANDARD Series
Page 54: ...Datasheet AL1 Standard Series 15 Meter System www BlueSkyMast com 877 411 6278 Page 54...
Page 55: ...Datasheet AL2 Standard Series 15 Meter System support blueskymast com 877 411 6278 Page 55...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......