877-411-6278
Page
53
AL1 / AL2 Standard Series User Manual
Primary and Secondary Guying (2 - 15 Meters)
Packing and Stowing the BlueSky Mast
2a
4
1
3
2b
4
5. Secure the Wheeling Carry Bag
A. Use the two straps on the inside of the bag too secure the tripod, pole bag and stake bag.
B. Put any other ancillary devices in the bag at this time.
C. Do not overload the bag or damage may occur.
D. Zip up the main outside zipper and secure the 3 straps on the outside of the bag.
1. Place Tripod in the Wheeling Carry Bag
A. Place tripod in the bag.
B. Rotate top leg so that base plate is vertical.
C. Slide tripod down to the bottom of the bag so that base plates touch the bottom.
2. Place the Small Items in the Wheeling Carry Bag
A. Put the mounting pole, guy rings and reference pack into the top right pocket.
B. Place the guy ropes in the bottom right Pocket.
3. Place Staking Kit Bag in the Wheeling Carry Bag
A. Put 4 guy stakes, 8 tripod stakes, and the hammer in the Staking Kit Bag.
B. Place the Staking Kit Bag between the legs of the tripod.
4. Place Pole Bags in the Wheeling Carry Bag
A. Put the poles n the Pole Bags.
B. Place the Pole Bags in the Wheeling Carry Bag on each side of the tripod.
Summary of Contents for AL1 STANDARD Series
Page 54: ...Datasheet AL1 Standard Series 15 Meter System www BlueSkyMast com 877 411 6278 Page 54...
Page 55: ...Datasheet AL2 Standard Series 15 Meter System support blueskymast com 877 411 6278 Page 55...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......