877-411-6278
Page
31
AL1 / AL2 Standard Series User Manual
Primary Guying Only (2 - 10 Meters)
8. Add the Mounting Pole
A. Locate the 18 Inch Mounting Pole (it is 1/2 the length of a mast pole) and slide it over the
silver insert of the first mast pole in the tripod.
B. Make sure the castle cut on both poles nest fully together and there is no silver visible in
the seams of the joint.
8.A
8.B
8.B
10.
Attach Your Device or Devices to the Mast
A. Attach your devices to mounting pole / mast.
B. Secure any loose cables to the mounting pole.
WARNING:
Use Velcro straps or some other form of cable management to secure in-
strument cables to the mast to reduce strain on cables and prevent damage to cable
connections. Loose cables can also cause the mast to lean to one side and affect per-
formance and safety
9.A
10.A
9.
Add the Primary Guy Ring
A. Locate the
Red Primary Guy Ring
and slide it over the top of the
mounting pole.
B. Pin it into the last hole at the base of the mounting pole.
C. Pull on the stainless steel push pin to make sure it has engaged
properly.
Summary of Contents for AL1 STANDARD Series
Page 54: ...Datasheet AL1 Standard Series 15 Meter System www BlueSkyMast com 877 411 6278 Page 54...
Page 55: ...Datasheet AL2 Standard Series 15 Meter System support blueskymast com 877 411 6278 Page 55...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......