12
13
2.4 Checklist before Installation
- After unpacking, please check the product appearance. If there is damage to the product,
contact your place of purchase.
- Remove packing box, tape and other packing components. If these things are not
removed, the ice machine may not function properly.
- Check the name plate for minimum electrical requirement for operating the machine.
Ensure there is sufficient electricity to operate the machine.
- To avoid any damage during installation, remove all panels.
Please refer to “2.5 How to Remove Panel”.
- Remove all accessories, enclosed with the ice machine.
- Remove protective plastic film on the panel.
- Check whether a compressor is secure and the fan blade turns freely.
- The ice machinemustbe installed onto the bin. The available binsare as below.
●
LB-300S: 30 inch(762mm)
●
LB-220S: 22 inch(558mm)
●
For further information, contact the seller.
2.3.3 Power Connection
- Permanently connect : Wiring must be greater than 12AWG.
- Cord connection: Refer to “1.1 Technical Specification” to check detailsof cable size requirements
for the power supply.
Summary of Contents for BLMI-300A
Page 1: ...InstallationandUser sManual BLMI 300A BLMI 500A BLMI 650A BLMI 900A ver 201803_02 I512A 200 ...
Page 7: ...1 2 Product Dimensions 300A 500A 7 FRONT TOP SIDE REAR ...
Page 8: ...8 650A FRONT TOP SIDE REAR ...
Page 9: ...9 900A FRONT TOP SIDE REAR ...
Page 34: ...MEMO 34 ...
Page 35: ...MEMO 35 ...