-16-
Revision 6/F3503
©
Moffat Ltd, April 2005
E26 Convection Oven
Four
Screws
6.2 ACCESS
6.2.1 CONTROL PANEL
1) Undo one screw at bottom of control
panel.
1) Undo the four screws holding the panel.
6.2.2 SERVICE (REAR) PANEL
1) Remove trays, racks and bottom tray.
2) Undo thumbscrew (top).
6.2.3 BAFFLE
2) Pull out bottom of control panel and drop
down to disengage tabs at top of control
panel.
Figure 6.2.1
2) Remove
panel.
Figure 6.2.2
3) Remove
baffle.
Figure 6.2.3
6.2.4 CONTROL PANEL—REAR
Buzzer
Power Switch
Heating Indicator
Thermostat
Bake Time Up
Indicator
Light Switch
Bake Timer
Figure 6.2.4
One Screw
Thumb
screw