2
1 866 907 0122 blubathworks.com
2017-06
General Instruction before Installation
IMPORTANT:
Ensure to check the bathtub for proper drainage before any draining is done.
• The bathtub is shipped with the waste and matching blu·stone
™
drain cover.
• Blu recommends that the tub be water tested before installation is complete. Fill the tub to overflow and inspect for leaks.
• Decide exactly where you wish to install the bathtub and place the tub where it is to be installed and ensure the tub is level.
Note:
Use 1½" (FIP) adaptor.
• Install the basic plumbing components: water inlet and waste. These tub models require a vertical plumbing connection from
the floor.
• Shims may be required to level the tub depending on finish floor surfaces. Shims are not included. When adjusting the level
allow a slight clearance (
8
") between the finished floor and the apron. Note: use a level to ensure accuracy.
• Connect the bathtub drain to the waste. Hook up the water to the faucet. Check that all connections are waterproof.
NOTE:
The faucet cannot be installed on the bathtub. The tub filler must be mounted either in the wall or a freestanding
floor-mounted tubfiller. Read the manufacturer’s instructions for installation details.