Installation Instructions
PREPARATION
• Clean, level, and prepare the floor for installation.
• Place the unit in the exact installed position on the floor and trace the outline of the bath with a pencil or any erasable
marking. (Fig. 1)
• Determine the location of the drain pipe on the floor by taking measurements of the drain and waste location underneath
the unit. (Fig. 2)
Note:
Drain and waste locations will vary by model.
• Using a blanket, cardboard, or other clean protective surface, turn the unit on its side so that the unit is properly
supported during drain installation.
• Clean the drain hole area in preparation of setting the drain. The area should be dry and free of any debris.
- wear protection
- two people recommended
1
2
3
4
INSTALL DRAIN HARDWARE
• Apply a bead of clear silicone around the drain body and pass it through the drain hole. (Fig. 3)
• Apply silicone over the bottom of the drain body. (Fig. 4)
• Attach the drain body nut on the drain body and tighten until the nut and washer have created a seal with the
bottom of the bathtub.
* DO NOT overtighten