INSTALLATION INSTRUCTIONS
READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION
Unpack the unit. Inspect all components for completeness and
condition. Ensure that all packing materials have been removed
from the unit.
Verify that the Spray Head Gasket (#33) and Spray Disk (#34)
are properly installed.
LEVELING THE UNIT
Verify that an adjustable leg is installed at each corner of the
brewer.
Set Brewer in its operating location. Level the Brewer. A spirit
level should be placed on the top of the unit, at the edge, as a
guide when making level adjustments.
Level the unit from left to right and front to back by turning the
adjustable feet. Be sure all four feet touch the counter to prevent
tipping.
FILL WATER TANK
Check the bottle ring for lint or packing materials. Wipe the
interior of the bottle ring with a cloth dampened with clean water.
Brewer is designed to use a 3 gallon or 5 gallon plastic water
bottle. Carefully insert a fresh water bottle into the bottle ring.
Wait 30 seconds, or until all bubbling in the bottle stops, then
drain water from the hot water faucet until all air is purged from
the tank.
ELECTRICIAN’S INSTALLATION INSTRUCTIONS
REFER TO ELECTRICAL SPECIFICATIONS - Page 1
Check the nameplate to determine correct electrical service
required for the Brewer to be installed.
IMPORTANT:
Before connecting to electricity, make sure a
bottle of water is installed on the bottle ring, and all air has been
bled from the water tank
Model
8382 is equipped with a cord and plug. It requires a 115 -
125 volt 20 amp circuit (50/60 Hz, 2 wire plus ground, with NEMA
5-15R or 5-20R Receptacle).
IMPORTANT:
Supply power must match nameplate for voltage and phase.
Connecting to the wrong voltage will damage the brewer or result
in decreased performance. Such damage is not covered by
warranty.
IMPORTANT:
The ground prong of the plug is part of a system
designed to protect you from electrical shock in the event of
internal damage. Never cut off the ground prong nor twist a
blade to fit an existing receptacle. Contact a licensed electrician
to install the proper circuit and receptacle.
IMPORTANT:
To enable the installer to make
a quality installation and to
minimize installation time, the
following suggestions and tests
should be done before the
actual unit installation is started:
CAUTION:
Equipment
Electrical Damage
DO NOT plug in or energize this
appliance until all Installation
Instructions are read and
followed. Damage to the
Brewer will occur if these
instructions are not followed.
CAUTION: Unstable
Equipment Hazard
It is very important for safety
and for proper operation that the
brewer is level and stable when
standing in its final operating
position. Provided adjustable,
non-skid legs must be installed
at each corner of the unit.
Failure to do so will result in
movement of the brewer which
can cause personal Injury and/
or damage to brewer.
WARNING ELECTRIC
SHOCK HAZARD:
Brewer must be plugged into a
properly grounded electrical
receptacle to prevent possible
shock hazard. DO NOT
assume a plumbing line will
provide such a ground.
Electrical shock will cause death
or serious injury.
4