1. With the doors open, swing the GrayChain into position on the drill pipe. Bring the 3570
to the correct height. Approximately
12
” above the tool joint, position the 3570 onto the
pipe making sure that you do not run the tool on the pipe upset or tool joint.
2. Close the doors, clamping the spinner onto the drill pipe. This is accomplished by
pushing the door valve handle in. The door valve is located on the bottom left of the
spinner.
3. Activate the rotation of the drilling by pulling the throttle valve handle out. Rotation of
the drill pipe can be changed (spin in, spin out) by reversing the position of the Quick
Disconnects located at the motor.
4. Open the Spinner doors by pulling the door valve lever. The 3570 can now be safely
swung away from the pipe.
Changing Pipe Sizes
The GrayChain 3570 has a unique and easy method to set up the spinner for various drill
pipe sizes.
1. Shut off all air to the spinner and bleed off any residual pressure in the door cylinders.
This is accomplished be activating the door valve after the source air has been shut
completely off.
2. To change the pipe sizes simply release the Safety Pin below the chain case. Pull the
adjust roller shaft out of the top of the case.
3.
Locate the roller and roller shaft in one of the five designated slots for the appropriate
drill pipe size.
4. Replace the Safety Pin on the lower shaft. Restore the air supply.
Figure 5
Summary of Contents for 9G-3570AIR
Page 1: ...1 Blohm Voss Oil Tools LLC GRAYCHAIN 3570 PNEUMATIC 9G 3570AIR Technical Documentation...
Page 6: ...INTRODUCTION 6 INTRODUCTION...
Page 9: ...SPECIFICATIONS 9 SPECIFICATIONS...
Page 12: ...INSTALLATION 12 INSTALLATION...
Page 15: ...OPERATION 15 OPERATION...
Page 18: ...OPERATION 18 Figure 6...
Page 21: ...MAINTENANCE INSPECTION 20 MAINTENANCE...
Page 26: ...MAINTENANCE INSPECTION 25 Lubrication Points Figure 10...
Page 27: ...ASSEMBLIES 26 ASSEMBLIES...
Page 29: ...ASSEMBLIES 28 CASE ASSEMBLY 9G 1022ASSM Figure 12...
Page 31: ...ASSEMBLIES 30 MOTOR MOUNT SUB ASSEMBLY 9G1084 2 Figure 14...
Page 33: ...ASSEMBLIES 32 AIR MOTOR AND REDUCER ASSEMBLY 9G1001 4 Figure 15...
Page 40: ...ASSEMBLIES 39 RIGHT DOOR ASSEMBLY 9G 13035 1 Figure 21...
Page 42: ...ASSEMBLIES 41 LEFT DOOR ASSEMBLY 9G 13035 2 Figure 22...
Page 57: ...SPARE PARTS 56 SPARE PARTS...
Page 59: ...INDEX 58 INDEX...
Page 70: ...INDEX 69 X Y Z ZERK 36 43...