Installation
4
Owner's Responsibilities
Installation responsibilities prior to service
startup inspection
You are entitled to a free startĆup inspection serĆ
vice by our factory ASAP. Before a factory repreĆ
sentative arrives to perform a startup procedure,
the owner must already have satisfied the followĆ
ing requirements.
1. Oven(s) are uncrated, stacked (if applies) and
put in place.
NOTE: Please refer to Leg Attachment and
Stacking.
Maximum shelf loading - 100 lbs (45.5 Kg)
RATINGS - GAS APPLIANCES - CNV14G/AA
Gas Type
Gas Input
Voltage
Phase
Amps
Motor
U.S. and Canadian Installations
Natural
65,000 BTU/Hr
208Ć240
1
15
1/2HP 208Ć240VAC, 50/60 Hz
120
1
15
1/2HP 208Ć240VAC, 50/60 Hz
Propane
65,000 BTU/Hr
208Ć240
1
15
1/2HP 208Ć240VAC, 50/60 Hz
120
1
15
1/2HP 208Ć240VAC, 50/60 Hz
3/4" FNPT connector for all U.S. and Canadian installations
RATINGS - ELECTRIC APPLIANCES - CNV14E/AA
Voltage
Hz
Phase
Max Load (amps)
Motor
L1
L2
L3
208
60
1
89
89
-
1/2HP 208Ć240VAC, 50/60 Hz
208
60
3
52
52
52
1/2HP 208Ć240VAC, 50/60 Hz
240
60
1
82
82
-
1/2HP 208Ć240VAC, 50/60 Hz
240
60
3
47
47
47
1/2HP 208Ć240VAC, 50/60 Hz
480
60
3
23
23
23
1/2HP 208Ć240VAC, 50/60 Hz
380/220
50
3
25
25
25
1/2HP 208Ć240VAC, 50/60 Hz
415/240
50
3
27
27
27
1/2HP 208Ć240VAC, 50/60 Hz
400/230
50
3
26
26
26
1/2HP 208Ć240VAC, 50/60 Hz