background image

 

 

IMPORTANT SAFETY INSTRUCTIONS, READ CAREFULLY 

AND KEEP FOR FUTURE REFERENCE 

 

 

INSTALLATION                                                                   

 

 

IMPORTANT!!!    PLEASE READ BEFORE INSTALLATION 

 

  If the unit has recently been transported. Please let unit stand still for a minimum of 24 hours 

before plugging it in. 

 

  Make sure that there is proper ventilation around the unit in the where it will operate. 

  Make sure all accessories are installed before plugging the unit in.

 

  Please read through the manual in its entirety. 

  Disposal  of  old  equipment  should  be  done  responsibly  as  per  WEEE  regulations  and  local 

authority directives. 

 

CABINET LOCATION AND INSTALLATION GUIDELINES 

 

  Unpacking

 

     

The unit is delivered on a pallet and shrink-wrapped. Documentation is inserted into a clear 

pocket located inside the unit. Carefully remove the protective plastic film and cardboard from 
the unit exterior and from the door opening surround making sure that any sharp instrument 
used does not cause damage, plus remove any quality labels.

 

  Install the unit on strong and leveled surfaces

 

unit may make unpleasant noises if surface is uneven 

unit may malfunction if surface is uneven 

If the floor is not flat, please use something to make sure the base of this unit in horizontal 

level 

 

Install the unit in an indoor, well-ventilated area 

unit performs more efficiently in a well-ventilated area Ensure the maximum design ambient 

temperature is not exceeded 

for best performance, please maintain clearance of 100mm / 4

” on the back of the unit, 

50mm / 2

” on the top of the unit. 

 

Summary of Contents for BCF20

Page 1: ...BLAST CHILLER Installation Operation Maintenance Manual BCF20 40 60 Models...

Page 2: ...General use of the cabinet 3 Operation instruction for temperature controller 4 REGULAR MAINTENANCE 10 Cleaning the condenser coil 10 Cleaning the fan blade and motor 11 Cleaning the interior of unit...

Page 3: ...n a pallet and shrink wrapped Documentation is inserted into a clear pocket located inside the unit Carefully remove the protective plastic film and cardboard from the unit exterior and from the door...

Page 4: ...ting equipment high ambient temperature will cause the compressor to overwork leading to higher energy bills and gradual breakdown of the unit The appliance shall not be exposed to rain sun The cabine...

Page 5: ...g period of time please unplug the unit from the outlet After unplugging the unit wait at least 10 minutes before re plugging it Failure to do so could cause damage to the compressor Do not attempt to...

Page 6: ...ate that product should be placed in the Blast Chiller Blast Freezer within 30 minutes from completion of cooking The packaging of food and the way in which it is loaded or placed within the equipment...

Page 7: ...all the main features of cycle can be printed start and end of the cycle length of the cycle logging of the temperature of the cabinet and goods Frontal panel Quick start 1 DISPLAY The upper display...

Page 8: ...DING PHASE TO DISPLAY Push and release the SET key 6 the holding set point of the selected cycle is displayed for 5 sed TO MODIFY while the set point is displayed hold pushed the SET key till the HdS...

Page 9: ...NT While SETH is displayed hold pushed the SET key till the SETH label starts flashing and LED near the SET key is turned on Use the arrow key to modify the value and the SET key to confirm it TO CONF...

Page 10: ...following table 9 HOW TO SELECT A CYCLE 1 Push the to move among the cycles C1 C2 C3 C4 and the holding cycle The related symbol on the display will be lighted and the cycle will be selected NOTE to...

Page 11: ...sually called hard chill soft chill freezing cycle 2 For each phase there are 3 parameters iS1 iS 2 iS 3 Set point related to the insert probes that stops the current phase rS1 rS2 rS3 set point of th...

Page 12: ...the three insert probes reach the iS3 value the values End followed by the i1P or i2P or i3P are shown on the display Cycle ends when all the probes have reached the iS3 value A signal is generated bu...

Page 13: ...gular basis preferably weekly Simply remove door gasket from the frame of the door soak in warm water and soap for thirty 30 minutes dry with soft cloth and replace Check door gaskets for proper seal...

Page 14: ...ure gaskets are snapped in completely Remove gasket and wash with soap and water Check condition of gasket and Replace if necessary Clean the condenser coil Unplug unit and allow coil to defrost Make...

Page 15: ...W D H mm wats W Load A Climate Class Container capacity in GN1 1 Chilling capacity in 90mins kg Freezing capacity in 240mins kg BCF20 HC R290 150 800 800 930 750 4 5 4 5 20 15 BCF40 HC R290 150 800 80...

Page 16: ...Adjusting parameters on a Blizzard Blast Chiller To start the cycle press and release the key...

Page 17: ...Pre set cycle settings...

Reviews: