INSTALL CABLE HOLSTERS  

 

Note: A 8" (200 MM) SHANK, 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE 
CHARGING STATION  
 

 

 

 

 

 

 

Summary of Contents for SEMACONNECT 7 Series

Page 1: ...Series 7 7 8 8 INSTALLATION MANUAL ...

Page 2: ...REMENTS 5 ELECTRICAL REQUIREMENTS 6 STATION CONNECTION DIAGRAMS 8 COMMUNICATION REQUIREMENTS 9 NETWORK PLATFORM REQUIREMENTS 9 HARDWARE INVENTORY SPECIFICATION AND INSTALLATION 10 PEDESTAL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM CMS 10 PEDESTAL MOUNT WITH CABLE MANAGEMENT SYSTEM CMS 17 WALL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM CMS 28 WALL MOUNT WITH CABLE MANAGEMENT SYSTEM CMS 35 START UP 47 ...

Page 3: ...of responsibility to comply with all applicable codes and safety standards This document describes the most common installation and mounting methods Contact SemaConnect Inc where it is not possible to perform an installation using the procedures provided in this document SemaConnect Inc is not responsible for damages that may occur or result from installations that are not described in this docume...

Page 4: ...d or any modification not approved by the manufacturer will void the limited warranty Other than the limited product warranty provided by SemaConnect this manual and the SemaConnect Inc products are provided AS IS and SemaConnect Inc expressly disclaim all implied warranties including any warranty of design merchantability and fitness for a particular purposes and non infringement to the maximum e...

Page 5: ...ot required All breakers must be non GFCI breakers Anchoring detail is the responsibility of others Anchoring must be capable of minimum weight and height in accordance with the provided table Any seismic wind loading and or snow loading considerations increasing weights or wind profile of unit will be the responsibility of others WEIGHT LBS HEIGHT INCHES SERIES 7 18 OUTPUT CABLES 36 20 5 SERIES 7...

Page 6: ... SemaConnect EV charging station is listed and labeled through Nationally Recognized Testing Laboratory compliance testing at the maximum or full rated output Each station is capable of continuous full rated output up to its labeled rating or modified default output configurations in accordance with the following tables ...

Page 7: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com ...

Page 8: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com Station Connection Diagrams DUAL SOURCE INPUT SINGLE SOUCE INPUT ...

Page 9: ...aConnect EV charging station location Verizon 4G LTE Band 13 RSRP 95 dBm RSRQ 13 dB Band 4 ATT 4G LTE Band 2 Band 4 Band 5 Band 12 Band 13 RSRP 95 dBm RSRQ 13 dB SemaConnect stations do not use 5G cellular or Wi Fi communication protocols Network Platform Requirements To enable modified output configurations or load management configurations SemaConnect must be notified during station Start up enr...

Page 10: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com HARDWARE INVENTORY SPECIFICATION AND INSTALLATION PEDESTAL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM CMS ...

Page 11: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com Pedestal Mount Inventory Specification ...

Page 12: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 1 INSTALL ANCHOR PLATE VERIFY ALL CONDUCTORS ARE DE ENERGIZED ...

Page 13: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 2 REMOVE ACCESS PANEL COVER AND INSTALL PEDESTAL WITH ACCESS PLATE OPENING FORWARD FACING VERIFY ALL CONDUCTORS ARE DE ENERGIZED ...

Page 14: ...ALL CHARGING HEAD UNIT Refer to General Requirements section for station weights VERIFY ALL CONDUCTORS ARE DE ENERGIZED COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4 SEE SYSTEM REQUIREMENTS SECTION FOR CONNECTION DETAILS RE INSTALL ACCESS PANEL COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS ...

Page 15: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 4 INSTALL CABLE RACK ...

Page 16: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 5 INSTALL CABLE HOLSTERS Note A 8 200 MM SHANK 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING STATION ...

Page 17: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com PEDESTAL MOUNT WITH CABLE MANAGEMENT SYSTEM CMS ...

Page 18: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com Pedestal Mount with Cable Management System Inventory Specification ...

Page 19: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 1 INSTALL ANCHOR PLATE VERIFY ALL CONDUCTORS ARE DE ENERGIZED ...

Page 20: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 2 REMOVE ACCESS PANEL COVER AND INSTALL PEDESTAL WITH ACCESS PLATE OPENING FORWARD FACING VERIFY ALL CONDUCTORS ARE DE ENERGIZED ...

Page 21: ...ALL CHARGING HEAD UNIT Refer to General Requirements section for station weights VERIFY ALL CONDUCTORS ARE DE ENERGIZED COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4 SEE SYSTEM REQUIREMENTS SECTION FOR CONNECTION DETAILS RE INSTALL ACCESS PANEL COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS ...

Page 22: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 4 INSTALL CABLE RACK CABLE RACK OPTIONAL WITH CABLE MANAGEMENT SYSTEM ...

Page 23: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 5 INSTALL CABLE HOLSTERS Note A 8 200 MM SHANK 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING STATION ...

Page 24: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 6 INSTALL CABLE MANAGEMENT SYSTEM CMS Refer to General Requirements section for Cable Management System Weights ...

Page 25: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 7 INSTALL CMS PEDESTAL CLAMP ...

Page 26: ... dwfwdfwfwfwfwffffgd www SemaConnect com 8 INSTALL CABLE MANAGEMENT SYSTEM OUTPUT CABLE CLAMPS 30A 48A Cable Clamp 80A Cable Clamp 18 Cable Install clamp 9 from the output cable J1772 coupler 25 Cable Install clamp 9 from the output cable J1772 coupler ...

Page 27: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 9 REMOVE CMS COUNTERWEIGHT RETENTION BOLTS ...

Page 28: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com WALL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM CMS ...

Page 29: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com Wall Mount Inventory Specification ...

Page 30: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 1 REMOVE ACCESS PANEL AND INSTALL WALL MOUNT ASSEMBLY ...

Page 31: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 2 CONNECT CONDUIT TO WALL MOUNT ASSEMBLY TRADE SIZE 1 TRADE SIZE ...

Page 32: ...ALL CHARGING HEAD UNIT Refer to General Requirements section for station weights VERIFY ALL CONDUCTORS ARE DE ENERGIZED COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4 SEE SYSTEM REQUIREMENTS SECTION FOR CONNECTION DETAILS RE INSTALL ACCESS PANEL COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS ...

Page 33: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 4 INSTALL CABLE RACK ...

Page 34: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 5 INSTALL CABLE HOLSTERS Note A 8 200 MM SHANK 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING STATION ...

Page 35: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com WALL MOUNT WITH CABLE MANAGEMENT SYSTEM CMS ...

Page 36: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com WALL MOUNT WITH CABLE MANAGEMENT SYSTEM INVENTORY SPECIFICATION ...

Page 37: ...ight 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 1 USING THE DRAWING BELOW MARK ALL AND DRILL ALL ANCHOR CENTERS FOR CMS SUPPORT BRACKETS AND WALL MOUNT BRACKET ASSEMBLY ...

Page 38: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 2 MOUNT AND SECURE CMS BRACKETS TO WALL Max Anchor Size Ø 0 236 ...

Page 39: ...Connect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 3 MOUNT AND SECURE CMS TO CMS BRACKETS AND TO FLOOR Refer to General Requirements section for Cable Management System Weights Max Anchor Size Ø 0 236 ...

Page 40: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 4 REMOVE ACCESS PANEL COVER AND INSTALL WALL MOUNT BRACKET ASSEMBLY AND WALL MOUNT ASSEMBLY ...

Page 41: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 5 CONNECT CONDUIT TO WALL MOUNT ASSEMBLY ...

Page 42: ...ALL CHARGING HEAD UNIT Refer to General Requirements section for station weights VERIFY ALL CONDUCTORS ARE DE ENERGIZED COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4 SEE SYSTEM REQUIREMENTS SECTION FOR CONNECTION DETAILS RE INSTALL ACCESS PLATE COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS ...

Page 43: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 7 INSTALL CABLE RACK CABLE RACK OPTIONAL WITH CMS ...

Page 44: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 8 INSTALL CABLE HOLSTERS Note A 8 200 MM SHANK 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING STATION ...

Page 45: ... dwfwdfwfwfwfwffffgd www SemaConnect com 9 INSTALL CABLE MANAGEMENT SYSTEM OUTPUT CABLE CLAMPS 30A 48A Cable Clamp 80A Cable Clamp 18 Cable Install clamp 9 from the output cable J1772 coupler 25 Cable Install clamp 9 from the output cable J1772 coupler ...

Page 46: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 10 REMOVE CABLE MANAGEMENT SYSTEM CMS COUNTERWEIGHT RETENTION BOLTS ...

Page 47: ... installation station registration and load management and or modified output configurations have been completed if applicable the SemaConnect station is ready to be energized After energizing the station both at a glance LED lights should illuminate BLUE If both station at a glance LED lights do not illuminate BLUE please refer to the following troubleshooting guidance No LED lights or LCD screen...

Page 48: ...nce Use clean soft cloth along with mild detergent to wash the dirt off Pour water gently from the top and use a wet dry cloth to clean all the sides Do not use excessive water pressure Do not use strong detergents or any other chemicals acids petrol thinner or any other solvent Avoid exerting excessive pressure on the device while cleaning Do not open the device Do not use a vacuum cleaner ...

Reviews: