5 BBL Single Wall Hybrid Brewhouse V6
© Blichmann Engineering, LLC 2022
For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts
3
Note: that you can easily couple hoses together with a clamp
and gasket to make long runs to fermentors etc.
Additional hoses can be purchased.
Length (1.5 inch ID)
Quantity
7 Feet
3
12 Feet
1
Construction:
Tube: FDA white EPDM (non oily transfer applications)
Reinforcement: Multiple plies of polyester tire cord with wire helix
Cover: Red EPDM
Temperature Range: -40°F to +225°F
Not for continuous steam service
Stainless Steel 1.5 Inch Tri-Clamp ends
HOSES
HEATING ELEMENTS
3.5 BBL Heating Element
Place heating elements (3) into the boil kettle and hot
liquor tank. Ensure the nuts on the element junction
boxes are tight to prevent water entry into the heater as
shown.
Water entry into the element will cause failure.
STAND PIPE
For the Boil Kettle only install the stand pipe in the drain fitting
inside the kettle as shown. To install and remove the standpipe,
simply use a hook to lower it into the drain hole and reverse for
removal. This will keep the bulk of the settled hops and break
material in the bottom of kettle and out of the chiller. Use of
the stand pipe, while recommended, is optional. If you plan to
treat your brewing water by boiling, the use of the stand pipe
works well in your HLT to leave settled water salts behind. An
extra stand pipe can be purchased on our parts site or at time
of order.
METAL CANE NOT INCLUDED
FALSE BOTTOM
Install the false bottom through the manway in the mash tun (MT) one
segment at a time starting with the center section. Install the U-shaped
securing clips between the sections to secure them as shown.