SINGLE PHASE CONTROLLER
Main Power GFI Breaker
– this industrial grade GFI (ground fault interrupting) breaker is the connection point for main power
cables connected to the panel. Consult your local codes to determine if you can utilize this breaker as a main disconnect as well.
In any case, we highly recommend a suitable disconnect switch be installed prior to the panel for safe servicing of the panel. Your
contractor will need to punch a hole in your panel for the main power cable conduit in your desired location. Power demand for
the brewhouse is 150A at 230V (single phase). Select a main breaker setting for 20% above the appropriate amperage to avoid
nuisance tripping or as directed by your local codes.
DC Control Power Supply
Main GFI Breaker
Heating Element Breakers
Heating Element Contactors
System Ground
Heating Element